|
|
||
| For
Immediate Release |
Contact: |
Chuck
Wolfe Andrea
Clifford
|
| 15-Ton
weight limit to be posted for A draft report from a biennial inspection performed in December 2008 indicates advanced deterioration on various components of the bridge. As a precaution, cabinet officials decided to post the bridge at a 15-ton weight limit while developing plans for repairs. Designs are underway with the goal of awarding a contract in early summer. The weight limit posting will be re-evaluated after repairs have been made. The posted limit has the effect of restricting commercial vehicle traffic from the bridge. Signs will be installed on regional routes to alert truck drivers to the weight restriction. Vehicles
weighing over 15 tons must take an alternate route to cross the
### |
||