The report for any given Post-Construction Meeting may be accessed by simply clicking on the desired item number.

Post-Construction Review Meetings for District 8

County/
Item No.
Route Date Project Description
Pulaski Co.
08-00121.01
KY 7450 10/20/99 Somerset ByPass from Industrial Park to KY 80 Grade/Drain/Surface
Cumberland Co.
08-00158.01
KY 61 10/21/99 Burkesville-Columbia Rd. from Jones Chapel Rd to 150' south of the Adair County Line Grade/Drain
Pulaski Co.   10/20/99 Whitley City-Somerset Road Grade/Drain/Surface
Rockcastle Co.
08-00144.00
KY 5359 03/03/98   Bridge Replacement
Lincoln Co.
08-00244.01
US 150 03/03/98   Grade/Drain/Surface
Pulaski Co.
08-00112.00
KY 7450 03/04/98 Somerset ByPass Grade/Drain/Surface
Rockcastle Co.
08-00143.00
US 25 03/29/01 From I-75 to Mt. Vernon-Berea Rd. Grade/Drain/Surface
Rehabilitation
Rockcastle Co.
08-0004.00 & 08-0004.01
I-75 03/29/01 From Laurel Co. Line to KY 2791 Grade/Drain/Surface
Widening/Rehab