The report for any given
Post-Construction Meeting may be accessed by simply clicking on the desired item number.
Post-Construction
Review Meetings for District 7 |
County/
Item No. |
Route |
Date |
Project |
Description |
|
Fayette Co. |
US 68 |
11/19/96 |
Harrodsburg Rd. |
Pavement Rehabilitation
|
|
Clark Co. |
KY 1958 |
04/07/98 |
|
Grade/Drain/Surface |
|
Boyle Co. |
US 68 |
04/05/00 |
US 68 from KY 1894 to 4.5 miles of
Perryville |
Grade/Drain/Surface |
Mercer Co
07-02000.00 |
US 127 ByPass |
04/08/98 |
|
Grade/Drain/Surface |
Fayette Co.
07-02000.00 |
I-64 |
04/09/98 |
|
Pavement Rehabilitation |
Clark Co.
07-02010.00 |
KY 9000 |
02/23/01 |
|
Grade/Drain/Surface |
|
Clark Co. |
KY 1958 |
04/04/00 |
Winchester Bypass from Red Wing Dr. to KY
627 |
Grade/Drain/Surface |
|
Fayette Co. |
US 25 |
04/04/00 |
North of Clay's Ferry to Grimes Mill Road |
Grade/Drain/Surface |
|
|
|
|
|
|
|