The report for any given Post-Construction Meeting may be accessed by simply clicking on the desired item number.

Bridge Repair

Post-Construction Review Meetings for District 3

County/
Item No.
Route Date Project Description

Warren Co.

US 68

12/10/96

US 68 Auburn-Bowling Green Rd

Widening/Realignment

Barren Co I-65 12/10/96 Pavement Rehabilitation
Barren/Allen Cos. US 31E 10/28/99    
Todd Co.   03-02003.00 US 79 10/27/99 US 79 from MP 0.00 to MP 1.99 Pavement Rehabilitation
Warren Co.   03-00052.01 KY 880 10/27/99 From Industrial Drive to US 31W Grade/Drain/Surface