Highway Design - Plan Processing

INSIDE THE CABINET KYTC HOME  
Search KYTC
 
   
Sections
Get Information on:
 
Plan Processing

Plan Processing, a section in the Division of Highway Design, works with Design Consultants, District Design offices and other Divisions within the Transportation Cabinet, checking bid items and codes, standard drawings, receiving and attaching Utility plans, checking notes and specifications and assuring that plan sets meet the latest standards as set out in the Standard Specifications for Road and Bridge Construction as well as Design Memorandums. The Plan Processing Staff is available to assist District Offices and Design Consultants with any issues regarding the procedures for plan submittals to Construction Procurement.

Contact Plan Processing Staff:

Bill Greene- Section Head
Dee McElmurray
Pam Kolze
Jeff Lail

PLAN PROCESSING GUIDANCE  

LINKS OF INTEREST:

2008 Check Print & Plan Submittal Schedule
Revised January 28, 2008

Plan Development Checklist

Plan Review Checklist
*Please review these items prior to submitting check prints or plans.

Fuel Adjustment Spreadsheet
*Use this spreadsheet to determine the quantities for the Fuel Adjustment Bid Items established by Design Memorandum 1-06.

Contractor QAS Suspension Memo
*Contractor QAS Special Note 11A suspended effective August 6, 2007

Check Print Submittal Documents
*Documents and information to be included with the Check Print Submittal

Final Contract Plans Submittal Documents *Documents and information to be included with the Final Contract Plan Submittal

 

Highway Design Memorandums

Sepia List

Geotechnical Reports

Construction Procurement

2008 Special Notes and Provisions

 

 

 


 
Privacy | Disclaimer | Individuals with Disabilities | Feedback | Text Only Page
Copyright © 2007 Commonwealth of Kentucky All rights reserved.