Item List 030334 |
Date:09/25/2007 |
KENTUCKY TRANSPORTATION CABINET
| Contract ID | 030334 | Primary Project Number | X025006405001 |
| Contract Description | LEXINGTON-CATLETTSBURG ROAD (I-64) | ||
| Primary County | CLARK | Federal/State Number | IM-NH 64-5 (63) 89 |
| Vendor ID | 00135 | Vendor Name | THE ALLEN COMPANY INC |
| Bid Amount | $ 20,636,242.58 | ||
| SM- Project | X025006405001 |
| Fed/State Number | IM-NH 64-5 (63) 89 |
| Project Description | LEXINGTON-CATLETTSBURG ROAD (I-64) |
| *********** |
| SM- Project | X025006405001 | CATEGORY NUMBER | 0011 | CATEGORY Description | DEMOBILIZATION AND MOBILIZATION | CPES SUBSECTION K |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 1670 | 0167 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$590,000.000 |
LS | 2.9 |
| 1680 | 0168 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$298,000.000 |
LS | 1.4 |
Category Total $888,000.00 |
| SM- Project | X025006405001 | CATEGORY NUMBER | 0009 | CATEGORY Description | LIGHTING | CPES SUBSECTION I |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 1590 | 0162 | POLE BASE IN MEDIAN WALL | 04741 | 56.000 |
56.000 |
$1,400.000 |
EACH | 0.4 |
| 1620 | 0163 | JUNCTION BOX-ELECTRICAL | 04810 | 6.000 |
6.000 |
$300.000 |
EACH | 0.0 |
| 1630 | 0164 | JUNCTION BOX TYPE B | 04811 | 12.000 |
12.000 |
$300.000 |
EACH | 0.0 |
| 1600 | 0165 | CONDUIT-2 INCH | 04795 | 1,712.000 |
1,712.000 |
$5.000 |
LF | 0.0 |
| 1610 | 0166 | CONDUIT-3 INCH | 04797 | 15,450.000 |
15,450.000 |
$7.500 |
LF | 0.6 |
Category Total $208,235.00 |
| SM- Project | X025006405001 | CATEGORY NUMBER | 0001 | CATEGORY Description | ROADWAY | CPES SUBSECTION A |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 1290 | 0001 | CONCRETE-CLASS A ROADWAY | 08100 | 545.600 |
545.600 |
$273.000 |
CUYD | 0.7 |
| 1310 | 0002 | STEEL REINFORCEMENT ROADWAY | 08150 | 68,193.000 |
68,193.000 |
$0.600 |
LB | 0.2 |
| 1230 | 0003 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 151.000 |
151.000 |
$45.000 |
CUYD | 0.0 |
| 1270 | 0004 | FOUNDATION PREPARATION (STA. 1547+19) | 08003 | 1.000 |
1.000 |
$1,560.000 |
LS | 0.0 |
| 1260 | 0005 | FOUNDATION PREPARATION (STA. 1547+19) | 08003 | 1.000 |
1.000 |
$1,560.000 |
LS | 0.0 |
| 1250 | 0006 | FOUNDATION PREPARATION (STA. 1547+19) | 08003 | 1.000 |
1.000 |
$1,560.000 |
LS | 0.0 |
| 1240 | 0007 | FOUNDATION PREPARATION (STA. 1547+19) | 08003 | 1.000 |
1.000 |
$2,280.000 |
LS | 0.0 |
| 0750 | 0008 | REMOVE CONCRETE MASONRY | 02403 | 108.100 |
108.100 |
$90.000 |
CUYD | 0.0 |
| 1220 | 0009 | DRILLED SHAFT-54" | 07306 | 49.400 |
49.400 |
$208.860 |
LF | 0.1 |
| 0040 | 0010 | CRUSHED AGGREGATE SIZE NO 2 | 00078 | 2.000 |
2.000 |
$75.000 |
TON | 0.0 |
| 0330 | 0011 | PERFORATED PIPE-4 INCH | 01000 | 731.000 |
731.000 |
$8.000 |
LF | 0.0 |
| 0340 | 0012 | PERFORATED PIPE-6 INCH | 01001 | 17,133.000 |
17,133.000 |
$5.250 |
LF | 0.4 |
| 0350 | 0013 | NON-PERFORATED PIPE-4 INCH | 01010 | 24.000 |
24.000 |
$15.000 |
LF | 0.0 |
| 0370 | 0014 | PERF PIPE HEADWALL TY 1-4 INCH | 01020 | 2.000 |
2.000 |
$500.000 |
EACH | 0.0 |
| 0560 | 0015 | ISLAND INTEGRAL CURB | 01845 | 34.500 |
34.500 |
$30.000 |
LF | 0.0 |
| 0570 | 0016 | DELINEATOR FOR BARRIER-YELLOW | 01985 | 1,560.000 |
1,560.000 |
$7.250 |
EACH | 0.1 |
| 0610 | 0017 | REMOVE PAVEMENT | 02091 | 390.000 |
390.000 |
$5.750 |
SQYD | 0.0 |
| 0620 | 0018 | GRANULAR EMBANKMENT | 02223 | 9,229.000 |
9,229.000 |
$25.000 |
CUYD | 1.1 |
| 0630 | 0019 | EMBANKMENT IN PLACE | 02230 | 134,309.000 |
134,309.000 |
$9.800 |
CUYD | 6.4 |
| 0640 | 0020 | WATER | 02242 | 3,585.000 |
3,585.000 |
$1.000 |
MGAL | 0.0 |
| 0650 | 0021 | REMOVE & REPLACE FENCE | 02268 | 32,699.000 |
32,699.000 |
$5.600 |
LF | 0.9 |
| 0660 | 0022 | GUARDRAIL-STEEL W BEAM-S FACE | 02351 | 9,737.500 |
9,737.500 |
$9.300 |
LF | 0.4 |
| 0670 | 0023 | GUARDRAIL TERMINAL SECTION NO 1 | 02360 | 5.000 |
5.000 |
$32.300 |
EACH | 0.0 |
| 0680 | 0024 | GUARDRAIL CONNECTOR TO BRIDGE END TY A | 02363 | 4.000 |
4.000 |
$1,430.000 |
EACH | 0.0 |
| 0690 | 0025 | GUARDRAIL END TREATMENT TYPE 1 | 02367 | 1.000 |
1.000 |
$2,610.000 |
EACH | 0.0 |
| 0700 | 0026 | GUARDRAIL END TREATMENT TYPE 2A | 02369 | 6.000 |
6.000 |
$340.000 |
EACH | 0.0 |
| 0710 | 0027 | GUARDRAIL END TREATMENT TYPE 3 | 02373 | 1.000 |
1.000 |
$400.000 |
EACH | 0.0 |
| 0720 | 0028 | REMOVE GUARDRAIL | 02381 | 15,500.000 |
15,500.000 |
$1.140 |
LF | 0.1 |
| 0730 | 0029 | GUARDRAIL END TREATMENT TYPE 4A | 02391 | 9.000 |
9.000 |
$1,450.000 |
EACH | 0.1 |
| 0740 | 0030 | TEMPORARY GUARDRAIL | 02397 | 900.000 |
900.000 |
$7.480 |
LF | 0.0 |
| 0780 | 0031 | CLEARING AND GRUBBING | 02545 | 1.000 |
1.000 |
$85,000.000 |
LS | 0.4 |
| 0810 | 0032 | FABRIC-GEOTEXTILE TYPE III | 02598 | 11,679.000 |
11,679.000 |
$1.500 |
SQYD | 0.1 |
| 0820 | 0033 | FABRIC-GEOTEXTILE TYPE IV | 02599 | 9,265.000 |
9,265.000 |
$1.500 |
SQYD | 0.1 |
| 0870 | 0034 | SAFELOADING | 02690 | 2.800 |
2.800 |
$210.000 |
CUYD | 0.0 |
| 0950 | 0035 | SIDEWALK-4 INCH CONCRETE | 02720 | 19.000 |
19.000 |
$61.000 |
SQYD | 0.0 |
| 0960 | 0036 | STAKING | 02726 | 1.000 |
1.000 |
$110,000.000 |
LS | 0.5 |
| 1360 | 0037 | CONC MED BAR TY 14C(50) | 20413ES508 | 15,379.000 |
15,379.000 |
$58.950 |
LF | 4.4 |
| 1380 | 0038 | CONC MED BAR TY 14C1(50) | 20414ES508 | 142.000 |
142.000 |
$343.600 |
LF | 0.2 |
| 1390 | 0039 | CONC MED BAR TY 12C2(50) | 20415ES508 | 180.000 |
180.000 |
$158.800 |
LF | 0.1 |
| 1370 | 0040 | CONC MED BAR TY 14C(50) MODIFIED | 20413ES508 | 142.000 |
142.000 |
$65.300 |
LF | 0.0 |
| 0970 | 0041 | REMOVE STRUCTURE | 02731 | 1.000 |
1.000 |
$150,000.000 |
LS | 0.7 |
| 0360 | 0042 | INSPECT & CERTIFY EDGE DRAIN SYSTEM | 01015 | 1.000 |
1.000 |
$10,000.000 |
LS | 0.0 |
| 0760 | 0043 | CHANNEL LINING CLASS II | 02483 | 3,754.500 |
3,754.500 |
$22.500 |
TON | 0.4 |
| 0770 | 0044 | CHANNEL LINING CLASS III | 02484 | 489.000 |
489.000 |
$31.500 |
TON | 0.1 |
| 0880 | 0045 | TEMPORARY SILT FENCE | 02701 | 976.000 |
976.000 |
$2.000 |
LF | 0.0 |
| 0900 | 0046 | SILT TRAP TYPE B | 02704 | 41.000 |
41.000 |
$420.000 |
EACH | 0.1 |
| 0910 | 0047 | SILT CHECK | 02705 | 175.000 |
175.000 |
$100.000 |
EACH | 0.1 |
| 1320 | 0048 | SILT CHECK TY II (MOD) | 09277 | 44.000 |
44.000 |
$210.000 |
EACH | 0.0 |
| 0920 | 0049 | CLEAN SILT TRAP TYPE B | 02707 | 41.000 |
41.000 |
$100.000 |
EACH | 0.0 |
| 0930 | 0050 | CLEAN SILT CHECK | 02708 | 175.000 |
175.000 |
$40.000 |
EACH | 0.0 |
| 1330 | 0051 | CLEAN SILT CHECK TY II (MOD) | 09278 | 44.000 |
44.000 |
$50.000 |
EACH | 0.0 |
| 0940 | 0052 | CLEAN TEMPORARY SILT FENCE | 02709 | 976.000 |
976.000 |
$0.600 |
LF | 0.0 |
| 1020 | 0053 | EROSION CONTROL BLANKET | 05950 | 12,574.000 |
12,574.000 |
$1.160 |
SQYD | 0.1 |
| 1030 | 0054 | TEMP SEEDING AND PROTECTION | 05953 | 16,258.000 |
16,258.000 |
$0.220 |
SQYD | 0.0 |
| 1040 | 0055 | TOPDRESSING FERTILIZER | 05966 | 9.400 |
9.400 |
$300.000 |
TON | 0.0 |
| 1050 | 0056 | SEEDING AND PROTECTION | 05985 | 162,585.000 |
162,585.000 |
$0.270 |
SQYD | 0.2 |
| 1060 | 0057 | SPECIAL SEEDING CROWN VETCH | 05989 | 31,729.000 |
31,729.000 |
$0.170 |
SQYD | 0.0 |
| 0830 | 0058 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$214,975.780 |
LS | 1.0 |
| 0580 | 0059 | RELOCATE TEMP CONC MED BARRIER | 02003 | 4,000.000 |
4,000.000 |
$4.000 |
LF | 0.1 |
| 0590 | 0060 | BARRICADE-TYPE III | 02014 | 4.000 |
4.000 |
$250.000 |
EACH | 0.0 |
| 0790 | 0061 | SIGNS | 02562 | 2,346.000 |
2,346.000 |
$6.850 |
SQFT | 0.1 |
| 0840 | 0062 | VAR MESSAGE SIGN-PORT 3 LINE | 02671 | 2.000 |
2.000 |
$25,000.000 |
EACH | 0.2 |
| 0980 | 0063 | FLASHING ARROW | 02775 | 4.000 |
4.000 |
$5,000.000 |
EACH | 0.1 |
| 0990 | 0064 | CRASH CUSHION TYPE VI-T | 02894 | 5.000 |
5.000 |
$10,165.000 |
EACH | 0.2 |
| 1000 | 0065 | CONCRETE BARRIER WALL TYPE 9T | 03171 | 36,940.000 |
36,940.000 |
$49.100 |
LF | 8.8 |
| 1210 | 0066 | REMOVE PAVEMENT MARKER TYPE V | 06600 | 487.000 |
487.000 |
$5.000 |
EACH | 0.0 |
| 1010 | 0067 | TUBULAR MARKERS | 03225 | 18.000 |
18.000 |
$50.000 |
EACH | 0.0 |
| 1070 | 0068 | PAVE STRIPING-TEMP PAINT-4 IN | 06510 | 30,725.000 |
30,725.000 |
$0.140 |
LF | 0.0 |
| 1080 | 0069 | PAVE STRIPING-TEMP PAINT-6 IN | 06511 | 583,698.000 |
583,698.000 |
$0.140 |
LF | 0.4 |
| 1100 | 0070 | PAVE STRIPING REMOVAL-6 INCH | 06531 | 1,320.000 |
1,320.000 |
$0.500 |
LF | 0.0 |
| 1130 | 0071 | PAVE STRIPING-TEMP REM TAPE-B | 06549 | 4,725.000 |
4,725.000 |
$2.450 |
LF | 0.1 |
| 1140 | 0072 | PAVE STRIPING-TEMP REM TAPE-W | 06550 | 121,406.000 |
121,406.000 |
$1.080 |
LF | 0.6 |
| 1150 | 0073 | PAVE STRIPING-TEMP REM TAPE-Y | 06551 | 104,316.000 |
104,316.000 |
$1.080 |
LF | 0.5 |
| 1170 | 0074 | PAVEMENT MARKER TY IVA-MW TEMP | 06585 | 946.000 |
946.000 |
$3.250 |
EACH | 0.0 |
| 1180 | 0075 | PAVEMENT MARKER TY IVA-MY TEMP | 06586 | 7,559.000 |
7,559.000 |
$3.250 |
EACH | 0.1 |
| 1090 | 0076 | PAVE STRIPING-PERM PAINT-4 IN | 06514 | 16,379.000 |
16,379.000 |
$0.120 |
LF | 0.0 |
| 1160 | 0077 | PAVE MARKING-THERMO STOP BAR-24IN | 06568 | 48.000 |
48.000 |
$5.000 |
LF | 0.0 |
| 1110 | 0078 | PAVE STRIPING-THERMO-6 INCH W | 06542 | 61,167.000 |
61,167.000 |
$0.500 |
LF | 0.1 |
| 1120 | 0079 | PAVE STRIPING-THERMO-6 INCH Y | 06543 | 40,778.000 |
40,778.000 |
$0.500 |
LF | 0.1 |
| 1190 | 0080 | PAVEMENT MARKER TYPE V-BY | 06591 | 104.000 |
104.000 |
$16.000 |
EACH | 0.0 |
| 1200 | 0081 | PAVEMENT MARKER TYPE V-B W/R | 06592 | 891.000 |
891.000 |
$16.000 |
EACH | 0.1 |
| 0190 | 0082 | ENTRANCE PIPE-15 INCH | 00440 | 240.000 |
240.000 |
$25.000 |
LF | 0.0 |
| 0210 | 0083 | CULVERT PIPE-15 INCH | 00461 | 56.000 |
56.000 |
$60.000 |
LF | 0.0 |
| 0200 | 0084 | CULVERT PIPE-15 INCH | 00461 | 177.000 |
177.000 |
$60.000 |
LF | 0.1 |
| 0230 | 0085 | CULVERT PIPE-18 INCH | 00462 | 18.000 |
18.000 |
$52.000 |
LF | 0.0 |
| 0220 | 0086 | CULVERT PIPE-18 INCH | 00462 | 132.000 |
132.000 |
$45.000 |
LF | 0.0 |
| 0240 | 0087 | CULVERT PIPE-24 INCH | 00464 | 153.000 |
153.000 |
$60.000 |
LF | 0.0 |
| 0260 | 0088 | STORM SEWER PIPE-15 INCH | 00521 | 27.000 |
27.000 |
$50.000 |
LF | 0.0 |
| 0250 | 0089 | STORM SEWER PIPE-15 INCH | 00521 | 61.000 |
61.000 |
$50.000 |
LF | 0.0 |
| 0280 | 0090 | STORM SEWER PIPE-18 INCH | 00522 | 106.000 |
106.000 |
$55.000 |
LF | 0.0 |
| 0270 | 0091 | STORM SEWER PIPE-18 INCH | 00522 | 1,837.000 |
1,837.000 |
$50.000 |
LF | 0.4 |
| 0320 | 0092 | STORM SEWER PIPE-18 INCH EQUIV | 00552 | 12.000 |
12.000 |
$58.000 |
LF | 0.0 |
| 0300 | 0093 | STORM SEWER PIPE-24 INCH | 00524 | 32.000 |
32.000 |
$60.000 |
LF | 0.0 |
| 0290 | 0094 | STORM SEWER PIPE-24 INCH | 00524 | 536.000 |
536.000 |
$55.000 |
LF | 0.1 |
| 0310 | 0095 | STORM SEWER PIPE-30 INCH | 00526 | 371.000 |
371.000 |
$65.000 |
LF | 0.1 |
| 0380 | 0096 | METAL END SECTION TY 4-18 INCH | 01411 | 1.000 |
1.000 |
$1,500.000 |
EACH | 0.0 |
| 0390 | 0097 | SLOPED BOX OUTLET TYPE 1-15 IN | 01432 | 3.000 |
3.000 |
$1,400.000 |
EACH | 0.0 |
| 0400 | 0098 | SLOPED BOX OUTLET TYPE 1-18 IN | 01433 | 3.000 |
3.000 |
$1,300.000 |
EACH | 0.0 |
| 0410 | 0099 | S & F BOX INLET-OUTLET-18 INCH | 01450 | 2.000 |
2.000 |
$1,900.000 |
EACH | 0.0 |
| 0420 | 0100 | S & F BOX INLET-OUTLET-24 INCH | 01451 | 4.000 |
4.000 |
$2,300.000 |
EACH | 0.0 |
| 0430 | 0101 | CURB BOX INLET TYPE B | 01480 | 2.000 |
2.000 |
$2,800.000 |
EACH | 0.0 |
| 0440 | 0102 | DROP BOX INLET TYPE 1 | 01490 | 4.000 |
4.000 |
$2,800.000 |
EACH | 0.1 |
| 0450 | 0103 | DROP BOX INLET TYPE 5C | 01508 | 3.000 |
3.000 |
$3,000.000 |
EACH | 0.0 |
| 0460 | 0104 | DROP BOX INLET TYPE 5D | 01511 | 7.000 |
7.000 |
$3,500.000 |
EACH | 0.1 |
| 0470 | 0105 | DROP BOX INLET TYPE 13G | 01559 | 9.000 |
9.000 |
$2,250.000 |
EACH | 0.1 |
| 0480 | 0106 | DROP BOX INLET TYPE 13S | 01568 | 1.000 |
1.000 |
$3,000.000 |
EACH | 0.0 |
| 0490 | 0107 | CONC MED BARR BOX INLET TY 14A2 50 | 01614 | 2.000 |
2.000 |
$4,000.000 |
EACH | 0.0 |
| 0500 | 0108 | CONC MED BARR BOX INLET TY 14A2 A1-50 | 01614 | 1.000 |
1.000 |
$4,500.000 |
EACH | 0.0 |
| 0510 | 0109 | CONC MED BARR BOX INLET TY 14B2 50 | 01615 | 16.000 |
16.000 |
$4,500.000 |
EACH | 0.3 |
| 0530 | 0110 | CONC MED BARR BOX INLET TY 14B1 50 | 01616 | 9.000 |
9.000 |
$4,775.000 |
EACH | 0.2 |
| 0520 | 0111 | CONC MED BARR BOX INLET TY 14B2 T-50 | 01615 | 2.000 |
2.000 |
$3,470.000 |
EACH | 0.0 |
| 1340 | 0112 | CONC MED BARR BOX INLET BOT PH-MOD | 09589M02 | 2.000 |
2.000 |
$1,400.000 |
EACH | 0.0 |
| 0540 | 0113 | JUNCTION BOX-24 INCH | 01643 | 1.000 |
1.000 |
$1,800.000 |
EACH | 0.0 |
| 0550 | 0114 | JUNCTION BOX | 01650 | 8.000 |
8.000 |
$1,300.000 |
EACH | 0.1 |
| 1280 | 0115 | CONCRETE-CLASS A | 08100 | 4.710 |
4.710 |
$950.000 |
CUYD | 0.0 |
| 1300 | 0116 | STEEL REINFORCEMENT | 08150 | 38.000 |
38.000 |
$1.000 |
LB | 0.0 |
| 0120 | 0117 | CL2 ASPH BASE 0.75D PG64-22 | 00221 | 9,443.000 |
9,443.000 |
$38.000 |
TON | 1.7 |
| 0140 | 0118 | CL2 ASPH SURF 0.38D PG64-22 | 00301 | 1,504.000 |
1,504.000 |
$42.000 |
TON | 0.3 |
| 0150 | 0119 | CL3 ASPH SURF 0.50D PG64-22 | 00312 | 8,143.000 |
17,732.809 |
$41.350 |
TON | 1.6 |
| 0160 | 0120 | CL4 ASPH SURF 0.50A PG76-22 | 00335 | 21,128.000 |
12,040.689 |
$56.950 |
TON | 5.8 |
| 0070 | 0121 | CL3 ASPH BASE 1.50D PG64-22 | 00205 | 13,848.000 |
13,848.000 |
$37.000 |
TON | 2.5 |
| 0090 | 0122 | CL3 ASPH BASE 1.00D PG64-22 | 00214 | 41,729.000 |
41,729.000 |
$37.900 |
TON | 7.7 |
| 0080 | 0123 | CL4 ASPH BASE 1.50D PG64-22 | 00208 | 16,411.000 |
16,411.000 |
$38.400 |
TON | 3.1 |
| 0100 | 0124 | CL4 ASPH BASE 1.00D PG64-22 | 00217 | 35,391.000 |
35,391.000 |
$38.400 |
TON | 6.6 |
| 0110 | 0125 | CL4 ASPH BASE 1.00D PG76-22 | 00219 | 23,635.000 |
23,635.000 |
$45.500 |
TON | 5.2 |
| 0050 | 0126 | ASPHALT SEAL AGGREGATE | 00100 | 390.200 |
390.200 |
$45.000 |
TON | 0.1 |
| 0130 | 0127 | EMULSIFIED ASPHALT RS-2 | 00291 | 47.100 |
47.100 |
$350.000 |
TON | 0.1 |
| 0060 | 0128 | LEVELING & WEDGING PG64-22 | 00190 | 32,469.000 |
32,469.000 |
$41.750 |
TON | 6.6 |
| 0020 | 0129 | DRAINAGE BLANKET-TYPE II-ASPH | 00018 | 34,428.000 |
33,610.785 |
$29.900 |
TON | 5.0 |
| 0890 | 0130 | SAND FOR BLOTTER | 02702 | 310.000 |
310.000 |
$32.000 |
TON | 0.0 |
| 0180 | 0131 | ASPHALT CURING SEAL | 00358 | 99.000 |
99.000 |
$300.000 |
TON | 0.1 |
| 0010 | 0132 | D G A BASE | 00001 | 130,502.000 |
102,912.000 |
$15.650 |
TON | 9.9 |
| 0030 | 0133 | TRAFFIC BOUND BASE | 00020 | 70.000 |
70.000 |
$25.000 |
TON | 0.0 |
| 0600 | 0134 | JPC PAVEMENT-8 INCH | 02084 | 67.000 |
67.000 |
$75.000 |
SQYD | 0.0 |