|
Item List 020697 |
Date:03/18/2008 |
KENTUCKY TRANSPORTATION CABINET
| Contract ID | 020697 | Primary Project Number | X059001707001 |
| Contract Description | IMPROVEMENT TO KY17 | ||
| Primary County | KENTON | Federal/State Number | FD04 059 0017 018-020 |
| Vendor ID | 00117 | Vendor Name | EATON ASPHALT PAVING CO INC AND SUBSIDIARY |
| Bid Amount | $ 2,487,224.00 | ||
| SM- Project | X059001707001 |
| Fed/State Number | FD04 059 0017 018-020 |
| Project Description | IMPROVEMENT TO KY17 |
| *********** |
| SM- Project | X059001707001 | CATEGORY NUMBER | 0001 | CATEGORY Description | ROADWAY | CPES SUBSECTION A |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0330 | 0001 | EMBANKMENT IN PLACE | 02230 | 31,161.000 |
36,161.000 |
$9.000 |
CUYD | 11.3 |
| 0340 | 0002 | WATER | 02242 | 500.000 |
500.000 |
$1.000 |
MGAL | 0.0 |
| 0760 | 0003 | CONCRETE-CLASS A | 08100 | 0.930 |
0.930 |
$800.000 |
CUYD | 0.0 |
| 0770 | 0004 | STEEL REINFORCEMENT | 08150 | 8.000 |
8.000 |
$5.000 |
LB | 0.0 |
| 0350 | 0005 | GUARDRAIL-STEEL W BEAM-S FACE | 02351 | 2,699.000 |
2,699.000 |
$12.000 |
LF | 1.3 |
| 0360 | 0006 | GUARDRAIL TERMINAL SECTION NO 1 | 02360 | 1.000 |
1.000 |
$54.000 |
EACH | 0.0 |
| 0370 | 0007 | GUARDRAIL END TREATMENT TYPE 1 | 02367 | 2.000 |
2.000 |
$2,600.000 |
EACH | 0.2 |
| 0380 | 0008 | GUARDRAIL END TREATMENT TYPE 2A | 02369 | 2.000 |
2.000 |
$378.000 |
EACH | 0.0 |
| 0590 | 0009 | PAVE STRIPING-TEMP PAINT-4 IN | 06510 | 12,030.000 |
12,030.000 |
$0.320 |
LF | 0.2 |
| 0600 | 0010 | PAVE STRIPING-PERM PAINT-4 IN | 06514 | 36,620.000 |
36,620.000 |
$0.210 |
LF | 0.3 |
| 0610 | 0011 | PAVE STRIPING-TEMP REM TAPE-W | 06550 | 1,290.000 |
1,290.000 |
$1.160 |
LF | 0.1 |
| 0620 | 0012 | PAVE STRIPING-TEMP REM TAPE-Y | 06551 | 1,290.000 |
1,290.000 |
$1.160 |
LF | 0.1 |
| 0630 | 0013 | PAVE STRIPING-DUR TY 1-4 IN W | 06554 | 1,828.000 |
1,828.000 |
$2.250 |
LF | 0.2 |
| 0640 | 0014 | PAVE STRIPING-DUR TY 1-4 IN Y | 06555 | 1,422.000 |
1,422.000 |
$2.270 |
LF | 0.1 |
| 0650 | 0015 | PAVE MARKING-THERMO X-WALK-6 INCH | 06565 | 835.000 |
835.000 |
$2.060 |
LF | 0.1 |
| 0660 | 0016 | PAVE MARKING-THERMO STOP BAR-12IN | 06567 | 772.000 |
772.000 |
$3.500 |
LF | 0.1 |
| 0670 | 0017 | PAVE MARKING-THERMO CROSS-HATCH | 06569 | 3,160.000 |
3,160.000 |
$1.950 |
SQFT | 0.2 |
| 0680 | 0018 | PAVE MARKING-DOTTED LANE EXTEN | 06572 | 797.000 |
797.000 |
$1.350 |
LF | 0.0 |
| 0690 | 0019 | PAVE MARKING-PRE THERM STR ARROW | 06573 | 3.000 |
3.000 |
$86.000 |
EACH | 0.0 |
| 0700 | 0020 | PAVE MARKING-PRE THERM CURV ARROW | 06574 | 74.000 |
74.000 |
$70.000 |
EACH | 0.2 |
| 0710 | 0021 | PAVE MARKING-PRE THERM COMB ARROW | 06575 | 2.000 |
2.000 |
$130.000 |
EACH | 0.0 |
| 0720 | 0022 | PAVEMENT MARKER TYPE V-MW | 06589 | 311.000 |
311.000 |
$21.000 |
EACH | 0.3 |
| 0730 | 0023 | PAVEMENT MARKER TYPE V-BY | 06591 | 292.000 |
292.000 |
$21.000 |
EACH | 0.2 |
| 0740 | 0024 | PAVEMENT MARKER TYPE V-B W/R | 06592 | 20.000 |
20.000 |
$21.000 |
EACH | 0.0 |
| 0750 | 0025 | PAVEMENT MARKER TYPE V-B Y/R | 06593 | 36.000 |
36.000 |
$21.000 |
EACH | 0.0 |
| 0520 | 0026 | FLASHING ARROW | 02775 | 2.000 |
2.000 |
$600.000 |
EACH | 0.0 |
| 0410 | 0027 | SIGNS | 02562 | 248.000 |
248.000 |
$4.600 |
SQFT | 0.0 |
| 0310 | 0028 | REMOVE PAVEMENT | 02091 | 38.000 |
38.000 |
$18.000 |
SQYD | 0.0 |
| 0120 | 0029 | STORM SEWER PIPE-15 INCH | 00521 | 1,128.000 |
1,128.000 |
$35.000 |
LF | 1.6 |
| 0130 | 0030 | STORM SEWER PIPE-18 INCH | 00522 | 875.000 |
875.000 |
$37.000 |
LF | 1.3 |
| 0140 | 0031 | STORM SEWER PIPE-24 INCH | 00524 | 43.000 |
43.000 |
$53.000 |
LF | 0.1 |
| 0150 | 0032 | STORM SEWER PIPE-30 INCH | 00526 | 6.000 |
6.000 |
$91.500 |
LF | 0.0 |
| 0160 | 0033 | STORM SEWER PIPE-36 INCH | 00528 | 399.000 |
399.000 |
$62.750 |
LF | 1.0 |
| 0100 | 0034 | ENTRANCE PIPE-12 INCH | 00439 | 50.000 |
50.000 |
$29.100 |
LF | 0.1 |
| 0110 | 0035 | ENTRANCE PIPE-15 INCH | 00440 | 122.000 |
122.000 |
$30.850 |
LF | 0.2 |
| 0170 | 0036 | CURB BOX INLET TYPE A | 01456 | 17.000 |
17.000 |
$3,200.000 |
EACH | 2.2 |
| 0180 | 0037 | DROP BOX INLET TYPE 1 | 01490 | 4.000 |
4.000 |
$2,750.000 |
EACH | 0.4 |
| 0190 | 0038 | DROP BOX INLET TYPE 4 | 01499 | 1.000 |
1.000 |
$3,150.000 |
EACH | 0.1 |
| 0200 | 0039 | DROP BOX INLET TYPE 5D | 01511 | 5.000 |
5.000 |
$2,860.000 |
EACH | 0.6 |
| 0210 | 0040 | DROP BOX INLET TYPE 7 | 01538 | 1.000 |
1.000 |
$3,100.000 |
EACH | 0.1 |
| 0220 | 0041 | JUNCTION BOX-15 INCH | 01641 | 1.000 |
1.000 |
$1,400.000 |
EACH | 0.1 |
| 0230 | 0042 | JUNCTION BOX-18 INCH | 01642 | 1.000 |
1.000 |
$1,400.000 |
EACH | 0.1 |
| 0240 | 0043 | JUNCTION BOX-24 INCH | 01643 | 1.000 |
1.000 |
$1,500.000 |
EACH | 0.1 |
| 0260 | 0044 | JUNCTION BOX-48 INCH | 01647 | 1.000 |
1.000 |
$2,600.000 |
EACH | 0.1 |
| 0250 | 0045 | JUNCTION BOX-36 INCH | 01645 | 1.000 |
1.000 |
$1,650.000 |
EACH | 0.1 |
| 0270 | 0046 | ADJUST MANHOLE | 01792 | 2.000 |
2.000 |
$510.000 |
EACH | 0.0 |
| 0560 | 0047 | SEEDING AND PROTECTION | 05985 | 23,085.000 |
23,085.000 |
$0.350 |
SQYD | 0.3 |
| 0540 | 0048 | TEMP SEEDING AND PROTECTION | 05953 | 3,377.000 |
3,377.000 |
$0.280 |
SQYD | 0.0 |
| 0570 | 0049 | SPECIAL SEEDING CROWN VETCH | 05989 | 7,500.000 |
7,500.000 |
$0.300 |
SQYD | 0.1 |
| 0580 | 0050 | SODDING | 05990 | 10,685.000 |
11,565.000 |
$3.300 |
SQYD | 1.4 |
| 0550 | 0051 | TOPDRESSING FERTILIZER | 05966 | 2.000 |
2.000 |
$575.000 |
TON | 0.0 |
| 0530 | 0052 | EROSION CONTROL BLANKET | 05950 | 1,000.000 |
1,000.000 |
$1.750 |
SQYD | 0.1 |
| 0470 | 0053 | SILT CHECK | 02705 | 11.000 |
11.000 |
$160.000 |
EACH | 0.1 |
| 0480 | 0054 | CLEAN SILT CHECK | 02708 | 22.000 |
22.000 |
$58.500 |
EACH | 0.1 |
| 0460 | 0055 | TEMPORARY SILT FENCE | 02701 | 1,075.000 |
1,075.000 |
$1.650 |
LF | 0.1 |
| 0490 | 0056 | CLEAN TEMPORARY SILT FENCE | 02709 | 1,075.000 |
1,075.000 |
$1.100 |
LF | 0.0 |
| 0780 | 0057 | SILT CHECK TY II (MOD) | 09277 | 14.000 |
14.000 |
$215.000 |
EACH | 0.1 |
| 0790 | 0058 | CLEAN SILT CHECK TY II (MOD) | 09278 | 28.000 |
28.000 |
$54.000 |
EACH | 0.1 |
| 0390 | 0059 | CHANNEL LINING CLASS III | 02484 | 50.000 |
50.000 |
$27.000 |
TON | 0.1 |
| 0280 | 0060 | STANDARD CURB AND GUTTER | 01810 | 4,744.000 |
4,744.000 |
$15.100 |
LF | 2.9 |
| 0420 | 0061 | EDGE KEY | 02585 | 100.000 |
100.000 |
$41.610 |
LF | 0.2 |
| 0500 | 0062 | SIDEWALK-4 INCH CONCRETE | 02720 | 1,825.000 |
1,902.500 |
$45.500 |
SQYD | 3.3 |
| 0320 | 0063 | CEM CONC ENT PAVEMENT-8 INCH | 02101 | 147.000 |
147.000 |
$62.500 |
SQYD | 0.4 |
| 0290 | 0064 | JPC PAVEMENT-10 INCH | 02069 | 1,753.000 |
1,753.000 |
$44.100 |
SQYD | 3.1 |
| 0300 | 0065 | JPC PAVEMENT-10 INCH SHLD | 02083 | 813.000 |
813.000 |
$44.100 |
SQYD | 1.4 |
| 0450 | 0066 | ASPH PAVE MILLING & TEXTURING | 02677 | 2,363.000 |
2,363.000 |
$6.600 |
TON | 0.6 |
| 0010 | 0067 | CRUSHED STONE BASE | 00003 | 13,024.000 |
13,024.000 |
$13.100 |
TON | 6.9 |
| 0030 | 0068 | LEVELING & WEDGING PG64-22 | 00190 | 1,795.000 |
1,795.000 |
$29.400 |
TON | 2.1 |
| 0070 | 0069 | EMULSIFIED ASPHALT RS-2 | 00291 | 6.500 |
6.500 |
$260.000 |
TON | 0.1 |
| 0020 | 0070 | ASPHALT SEAL AGGREGATE | 00100 | 55.000 |
55.000 |
$90.000 |
TON | 0.2 |
| 0040 | 0071 | CL2 ASPH BASE 1.00D PG64-22 | 00212 | 795.000 |
795.000 |
$32.800 |
TON | 1.0 |
| 0050 | 0072 | CL3 ASPH BASE 1.00D PG64-22 | 00214 | 13,632.000 |
13,632.000 |
$27.500 |
TON | 15.1 |
| 0060 | 0073 | CL3 ASPH BASE 1.00D PG76-22 | 00216 | 3,929.000 |
3,929.000 |
$28.800 |
TON | 4.5 |
| 0080 | 0074 | CL2 ASPH SURF 0.50D PG64-22 | 00309 | 368.000 |
605.550 |
$48.500 |
TON | 0.7 |
| 0090 | 0075 | CL3 ASPH SURF 0.50A PG76-22 | 00332 | 5,451.000 |
5,451.000 |
$35.800 |
TON | 7.8 |
| 0400 | 0076 | CLEARING AND GRUBBING | 02545 | 1.000 |
1.000 |
$3,000.000 |
LS | 0.1 |
| 0510 | 0077 | STAKING | 02726 | 1.000 |
1.000 |
$34,000.000 |
LS | 1.4 |
| 0430 | 0078 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$46,729.000 |
LS | 1.9 |
| 0440 | 0079 | MOBILIZATION FOR MILL & TEXT | 02676 | 1.000 |
1.000 |
$275.000 |
LS | 0.0 |
| 0800 | 0080 | GAS & UTILITY COORDINATION | 09405 | 1.000 |
1.000 |
$4,300.000 |
LS | 0.2 |
| 8000 | 8000 | EW~ Undercut | 10090NX | 0.000 |
1.000 |
$23,576.650 |
LS | 0.0 |
| 8001 | 8001 | EW~ Median Prep | 10090NX | 0.000 |
1.000 |
$6,140.800 |
LS | 0.0 |
| 8002 | 8002 | PAVE STRIPING-DUR TY 1-6 IN W | 06556 | 0.000 |
1,828.000 |
$2.930 |
LF | 0.0 |
| 8003 | 8003 | PAVE STRIPING-DUR TY 1-6 IN Y | 06557 | 0.000 |
1,650.000 |
$3.130 |
LF | 0.0 |
| 8004 | 8004 | PAVE STRIPING REMOVAL-6 INCH | 06531 | 0.000 |
1,836.000 |
$0.740 |
LF | 0.0 |
| 8005 | 8005 | EW~ Entrance Removal and Replacement | 10090NX | 0.000 |
1.000 |
$32,761.350 |
LS | 0.0 |
| 8006 | 8006 | EW~ Entrance Island | 10094NX | 0.000 |
3.000 |
$1,500.000 |
EACH | 0.0 |
| 8007 | 8007 | EW~ Curb Cut | 10093EX | 0.000 |
40.000 |
$49.660 |
LF | 0.0 |
| 8008 | 8008 | EW~ Sidewalk Ramp | 10094NX | 0.000 |
2.000 |
$2,050.000 |
EACH | 0.0 |
Category Total $1,980,209.60 |
| SM- Project | X059001707001 | CATEGORY NUMBER | 0002 | CATEGORY Description | SEWER | CPES SUBSECTION B |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0890 | 0081 | ADJUST MANHOLE | 01792 | 2.000 |
2.000 |
$318.000 |
EACH | 0.0 |
| 0880 | 0082 | RECONSTRUCT MANHOLE | 01789 | 1.000 |
1.000 |
$916.000 |
EACH | 0.0 |
Category Total $1,552.00 |
| SM- Project | X059001707001 | CATEGORY NUMBER | 0003 | CATEGORY Description | GASLINE | CPES SUBSECTION C |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0830 | 0083 | GAS MAIN INSTALL PL 4" | 09508 | 664.000 |
664.000 |
$33.000 |
LF | 0.9 |
| 0840 | 0084 | GAS MAIN INSTALL PL 6" | 09508 | 602.000 |
602.000 |
$35.000 |
LF | 0.8 |
| 0850 | 0085 | GAS MAIN INSTALL SWPC 6" | 09508 | 125.000 |
125.000 |
$68.000 |
LF | 0.3 |
| 0860 | 0086 | INSTALL SERVICE MC LONG-SIDE | 09623 | 5.000 |
5.000 |
$600.000 |
EACH | 0.1 |
| 0870 | 0087 | INSTALL SERVICE MC-SHORT-SIDE | 09623 | 2.000 |
2.000 |
$400.000 |
EACH | 0.0 |
| 0820 | 0088 | TIE-IN 6 INCH | 03466 | 3.000 |
3.000 |
$2,500.000 |
EACH | 0.3 |
| 0810 | 0089 | TIE-IN 6 INCH | 03466 | 6.000 |
6.000 |
$4,500.000 |
EACH | 1.1 |
Category Total $89,782.00 |
| SM- Project | X059001707001 | CATEGORY NUMBER | 0004 | CATEGORY Description | WATERLINE | CPES SUBSECTION D |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 1220 | 0090 | DUCTILE IRON PIPE-18 INCH | 01105 | 35.000 |
35.000 |
$107.000 |
LF | 0.2 |
| 1230 | 0091 | DUCTILE IRON PIPE-24 INCH | 01111 | 1,103.000 |
1,103.000 |
$86.000 |
LF | 3.8 |
| 1350 | 0092 | GATE VALVE-6 INCH | 03526 | 1.000 |
1.000 |
$758.820 |
EACH | 0.0 |
| 1360 | 0093 | ANCHOR TEE & BLOCK | 09037 | 1.000 |
1.000 |
$1,600.000 |
EACH | 0.1 |
| 1390 | 0094 | BEND & BLOCK 6" | 09040 | 1.000 |
1.000 |
$270.000 |
EACH | 0.0 |
| 1370 | 0095 | BEND & BLOCK 18" | 09040 | 4.000 |
4.000 |
$970.000 |
EACH | 0.2 |
| 1380 | 0096 | BEND & BLOCK 24" | 09040 | 10.000 |
10.000 |
$1,900.000 |
EACH | 0.8 |
| 1320 | 0097 | TIE-IN | 03479 | 2.000 |
2.000 |
$2,800.000 |
EACH | 0.2 |
| 1330 | 0098 | TIE-IN | 03479 | 4.000 |
4.000 |
$3,500.000 |
EACH | 0.6 |
| 1290 | 0099 | RELOCATE FIRE HYDRANT | 03433 | 5.000 |
5.000 |
$1,250.000 |
EACH | 0.3 |
| 1280 | 0100 | RELOCATE WATER METER | 03431 | 1.000 |
1.000 |
$600.000 |
EACH | 0.0 |
| 1240 | 0101 | COPPER PIPE-1 1/2 INCH | 03362 | 123.000 |
123.000 |
$37.880 |
LF | 0.2 |
| 1310 | 0102 | RECONNECT TO MAIN | 03438 | 4.000 |
4.000 |
$377.000 |
EACH | 0.1 |
| 1300 | 0103 | RECONNECT SERVICE | 03437 | 4.000 |
4.000 |
$300.000 |
EACH | 0.0 |
| 1250 | 0104 | ADJUST WATER VALVE | 03425 | 21.000 |
21.000 |
$167.000 |
EACH | 0.1 |
| 1270 | 0105 | ADJUST WATER METER | 03427 | 2.000 |
2.000 |
$210.000 |
EACH | 0.0 |
| 1260 | 0106 | ADJUST FIRE HYDRANT | 03426 | 1.000 |
1.000 |
$808.000 |
EACH | 0.0 |
| 1340 | 0107 | AIR RELEASE VALVE | 03495 | 1.000 |
1.000 |
$861.000 |
EACH | 0.0 |
Category Total $163,525.06 |
| SM- Project | X059001707001 | CATEGORY NUMBER | 0005 | CATEGORY Description | SIGNALIZATION | CPES SUBSECTION E |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0990 | 0108 | POLE 45 FT WOODEN | 04873 | 1.000 |
1.000 |
$810.000 |
EACH | 0.0 |
| 1000 | 0109 | ANCHOR | 04884 | 2.000 |
2.000 |
$97.000 |
EACH | 0.0 |
| 1010 | 0110 | MESSENGER-10800 LB | 04885 | 1,745.000 |
1,745.000 |
$2.600 |
LF | 0.2 |
| 0920 | 0111 | JUNCTION BOX TYPE B | 04811 | 16.000 |
16.000 |
$375.000 |
EACH | 0.2 |
| 0930 | 0112 | TRENCHING AND BACKFILLING | 04820 | 845.000 |
885.000 |
$1.650 |
LF | 0.1 |
| 1020 | 0113 | LOOP SAW SLOT AND FILL | 04895 | 2,908.000 |
3,968.000 |
$7.500 |
LF | 0.9 |
| 1070 | 0114 | INSTALL SIGNAL (LED) 3 LED | 09618 | 30.000 |
30.000 |
$188.000 |
EACH | 0.2 |
| 1080 | 0115 | INSTALL SIGNAL (LED) 4 LED | 09618 | 3.000 |
3.000 |
$200.000 |
EACH | 0.0 |
| 1050 | 0116 | REMOVE SIGNAL EQUIPMENT | 04950 | 5.000 |
5.000 |
$540.000 |
EACH | 0.1 |
| 1030 | 0117 | INSTALL CONTROLLER TYPE 170 | 04931 | 3.000 |
3.000 |
$1,900.000 |
EACH | 0.2 |
| 1040 | 0118 | INSTALL STEEL STRAIN POLE | 04932 | 12.000 |
12.000 |
$2,400.000 |
EACH | 1.2 |
| 1060 | 0119 | RELOCATE SIGNAL HEAD | 09224 | 4.000 |
4.000 |
$270.000 |
EACH | 0.0 |
| 0900 | 0120 | CONDUIT-1 1/4 INCH | 04793 | 973.000 |
1,013.000 |
$2.700 |
LF | 0.1 |
| 0910 | 0121 | CONDUIT-2 INCH | 04795 | 80.000 |
80.000 |
$4.300 |
LF | 0.0 |
| 0940 | 0122 | LOOP WIRE | 04830 | 6,559.000 |
11,004.000 |
$0.270 |
LF | 0.1 |
| 0950 | 0123 | CABLE-INTERCONNECT | 04840 | 5,342.000 |
5,342.000 |
$2.400 |
LF | 0.5 |
| 0960 | 0124 | CABLE-NO. 14/5C | 04844 | 3,831.000 |
3,831.000 |
$0.550 |
LF | 0.1 |
| 0970 | 0125 | CABLE-NO. 14/7C | 04845 | 211.000 |
211.000 |
$0.800 |
LF | 0.0 |
| 0980 | 0126 | CABLE-NO. 14/1 PAIR | 04850 | 5,205.000 |
5,205.000 |
$0.760 |
LF | 0.2 |
| 8009 | 8009 | EW~ Signal Coordination | 10090NX | 0.000 |
1.000 |
$500.000 |
LS | 0.0 |
Category Total $103,059.73 |
| SM- Project | X059001707001 | CATEGORY NUMBER | 0006 | CATEGORY Description | LIGHTING | CPES SUBSECTION F |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty |