Item List 020297 |
Date:08/22/2008 |
KENTUCKY TRANSPORTATION CABINET
| Contract ID | 020297 | Primary Project Number | X056716304001 |
| Contract Description | HURSTBOURNE PARKWAY | ||
| Primary County | JEFFERSON | Federal/State Number | DPR-STPM 021 (001) |
| Vendor ID | 00182 | Vendor Name | GOHMANN ASPHALT AND CONSTRUCTION INC |
| Bid Amount | $ 17,736,000.00 | ||
| SM- Project | X056716304001 |
| Fed/State Number | DPR-STPM 021 (001) (020297) |
| Project Description | HURSTBOURNE PARKWAY |
| *********** |
| SM- Project | X056716304001 | CATEGORY NUMBER | 0002 | CATEGORY Description | MOB / DEMOB |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 2540 | 0300 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$212,480.000 |
LS | 1.2 |
| 2530 | 0301 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$415,000.000 |
LS | 2.3 |
Category Total $627,480.00 |
| SM- Project | X056716304001 | CATEGORY NUMBER | 0003 | CATEGORY Description | BRIDGE | CPES SUBSECTION C |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 1270 | 0127 | STRUCTURE GRANULAR BACKFILL | 02231M | 62.000 |
62.000 |
$45.000 |
CU M | 0.0 |
| 1300 | 0128 | STRUCTURE EXCAVATION-COMMON | 08001M | 237.000 |
237.000 |
$26.000 |
CU M | 0.0 |
| 1310 | 0129 | STRUCTURE EXCAV-SOLID ROCK | 08002M | 59.000 |
59.000 |
$40.000 |
CU M | 0.0 |
| 1290 | 0130 | MASONRY COATING | 02998M | 4,685.000 |
4,685.000 |
$8.000 |
SQ M | 0.2 |
| 1370 | 0131 | CONCRETE-CLASS A | 08100M | 449.700 |
449.700 |
$300.000 |
CU M | 0.8 |
| 1380 | 0132 | CONCRETE-CLASS AAA (HPC MOD) | 08105M | 670.200 |
670.200 |
$450.000 |
CU M | 1.7 |
| 1320 | 0133 | CYCLOPEAN STONE RIP RAP | 08019M | 1,180.000 |
1,180.000 |
$19.000 |
MTON | 0.1 |
| 1350 | 0134 | PILES-STEEL HP310X79 | 08046M | 196.000 |
196.000 |
$100.000 |
M | 0.1 |
| 1360 | 0135 | PILE POINTS-12 INCH | 08094 | 32.000 |
32.000 |
$100.000 |
EACH | 0.0 |
| 1330 | 0136 | TEST PILES | 08033M | 30.000 |
30.000 |
$125.000 |
M | 0.0 |
| 1400 | 0137 | STEEL REINF-EPOXY COATED | 08151M | 103,392.000 |
103,392.000 |
$1.250 |
KG | 0.7 |
| 1390 | 0138 | STEEL REINFORCEMENT | 08150M | 36,854.000 |
36,854.000 |
$1.150 |
KG | 0.2 |
| 1420 | 0139 | PRECAST PC I BEAM TYPE 3 | 08633M | 764.400 |
764.400 |
$450.000 |
M | 1.9 |
| 1340 | 0140 | PRE-DRILLING FOR PILES | 08039M | 189.000 |
189.000 |
$150.000 |
M | 0.2 |
| 1280 | 0141 | FABRIC-GEOTEXTILE TYPE I | 02596M | 1,171.000 |
1,171.000 |
$1.600 |
SQ M | 0.0 |
| 1430 | 0142 | CHAIN LINK FENCE-1.2 M | 08710M | 130.000 |
130.000 |
$100.000 |
M | 0.1 |
| 1410 | 0143 | STRUCTURAL STEEL (STA 12+689) (APPROX 1422 KG) | 08160 | 1.000 |
1.000 |
$20,000.000 |
LS | 0.1 |
Category Total $1,113,087.70 |
| SM- Project | X056716304001 | CATEGORY NUMBER | 0004 | CATEGORY Description | MOB / DEMOB |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 2540 | 0305 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$17,920.000 |
LS | 0.1 |
| 2530 | 0306 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$35,000.000 |
LS | 0.2 |
Category Total $52,920.00 |
| SM- Project | X056716304001 | CATEGORY NUMBER | 0005 | CATEGORY Description | SEWER | PARTICIPATING - CPES SUBSECTION E |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 1510 | 0144 | DUCTILE IRON PIPE-200 MM | 01095M | 225.600 |
230.850 |
$82.000 |
M | 0.1 |
| 1530 | 0145 | REMOVE MANHOLE | 01787 | 1.000 |
1.000 |
$750.000 |
EACH | 0.0 |
| 1600 | 0146 | SAFELOADING | 02690M | 3.100 |
3.100 |
$96.000 |
CU M | 0.0 |
| 1620 | 0147 | PVC PIPE-150 MM | 03385M | 12.800 |
14.800 |
$180.000 |
M | 0.0 |
| 1630 | 0148 | PVC PIPE-200 MM | 03387M | 155.900 |
159.650 |
$77.000 |
M | 0.1 |
| 1650 | 0149 | CONCRETE-CLASS A | 08100M | 16.200 |
16.200 |
$600.000 |
CU M | 0.1 |
| 1660 | 0150 | STEEL REINFORCEMENT SEWER | 08150M | 54.000 |
54.000 |
$1.100 |
KG | 0.0 |
| 1670 | 0151 | CHAIN LINK FENCE-1.8 M | 08711M | 16.600 |
16.600 |
$40.000 |
M | 0.0 |
| 1580 | 0152 | SANITARY SEWER MANHOLE 6'-8' | 01799 | 4.000 |
6.000 |
$2,500.000 |
EACH | 0.1 |
| 1590 | 0153 | SANITARY SEWER MANHOLE 8'-10' | 01799 | 1.000 |
1.000 |
$2,900.000 |
EACH | 0.0 |
| 1570 | 0154 | SANITARY SEWER MANHOLE 12'-14' | 01799 | 1.000 |
1.000 |
$4,000.000 |
EACH | 0.0 |
| 1540 | 0155 | REMOVE MANHOLE (FRAME AND LID) | 01787 | 2.000 |
2.000 |
$750.000 |
EACH | 0.0 |
| 1710 | 0157 | CLEANOUT | 09073 | 2.000 |
2.000 |
$925.000 |
EACH | 0.0 |
| 1720 | 0259 | RELOCATE SERVICE | 09220M02 | 2.000 |
2.000 |
$1,300.000 |
EACH | 0.0 |
| 8021 | 8021 | EW~ Relocated Wendy's Forcemain | 10090NX | 0.000 |
1.000 |
$10,027.500 |
LS | 0.0 |
Category Total $67,148.50 |
| SM- Project | X056716304001 | CATEGORY NUMBER | 0007 | CATEGORY Description | SEWER NON | NON PARTICIPATING - CPES SUBSECTION G |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 1520 | 0158 | PLUG PIPE | 01314 | 2.000 |
2.000 |
$220.000 |
EACH | 0.0 |
| 1550 | 0159 | RECONSTRUCT MANHOLE | 01789 | 1.000 |
1.000 |
$2,000.000 |
EACH | 0.0 |
| 1610 | 0160 | TEMPORARY SILT FENCE | 02701M | 669.950 |
669.950 |
$4.950 |
M | 0.0 |
| 1630 | 0161 | PVC PIPE-200 MM | 03387M | 80.470 |
80.470 |
$77.000 |
M | 0.0 |
| 1640 | 0162 | PVC PIPE-300 MM | 03391M | 645.870 |
658.980 |
$78.000 |
M | 0.3 |
| 1580 | 0164 | SANITARY SEWER MANHOLE 6'-8' | 01799 | 4.000 |
4.000 |
$2,600.000 |
EACH | 0.1 |
| 1590 | 0165 | SANITARY SEWER MANHOLE 8'-10' | 01799 | 1.000 |
1.000 |
$2,900.000 |
EACH | 0.0 |
| 1560 | 0166 | SANITARY SEWER MANHOLE 10'-12' | 01799 | 1.000 |
1.000 |
$3,000.000 |
EACH | 0.0 |
| 1570 | 0167 | SANITARY SEWER MANHOLE 12'-14' | 01799 | 1.000 |
1.000 |
$4,000.000 |
EACH | 0.0 |
| 1700 | 0168 | DROP MANHOLE 8'-10' | 09064 | 2.000 |
2.000 |
$4,300.000 |
EACH | 0.0 |
| 1690 | 0169 | DROP MANHOLE 14'-16' | 09064 | 1.000 |
1.000 |
$4,600.000 |
EACH | 0.0 |
| 1730 | 0260 | CONCRETE ENCASEMENT | 09289M | 34.970 |
54.970 |
$400.000 |
CU M | 0.1 |
| 1680 | 0261 | STEEL ENCASEMENT-750MM | 09054M02 | 162.460 |
162.460 |
$170.000 |
M | 0.2 |
| 1740 | 0262 | STAB TEMP CONST ENTRANC | 09290M02 | 1.000 |
1.000 |
$2,500.000 |
EACH | 0.0 |
| 1750 | 0263 | STREAM CROSSING | 09291M02 | 1.000 |
1.000 |
$5,000.000 |
EACH | 0.0 |
| 1760 | 0264 | STREAM CROSSING MAINT | 09292M02 | 1.000 |
1.000 |
$2,000.000 |
EACH | 0.0 |
| 1770 | 0265 | LOW WATER CROSSING (TEMP) | 09293M02 | 1.000 |
1.000 |
$4,000.000 |
EACH | 0.0 |
| 1780 | 0266 | LOW WATER CROSSING MAINT | 09294M02 | 1.000 |
1.000 |
$2,000.000 |
EACH | 0.0 |
| 1790 | 0267 | COLOR PHOTOS | 09295M02 | 149.000 |
149.000 |
$5.000 |
EACH | 0.0 |
| 1800 | 0268 | VIDEO RECORDING | 09296M02 | 1.000 |
1.000 |
$1,200.000 |
LS | 0.0 |
Category Total $154,881.50 |
| SM- Project | X056716304001 | CATEGORY NUMBER | 0008 | CATEGORY Description | MOB / DEMOB | Sub Section G Demob |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 2540 | 0310 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$2,560.000 |
LS | 0.0 |
| 2530 | 0311 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$5,000.000 |
LS | 0.0 |
Category Total $7,560.00 |
| SM- Project | X056716304001 | CATEGORY NUMBER | 0009 | CATEGORY Description | TELEPHONE | CPES SUBSECTION I |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 1450 | 0178 | CONDUIT-100 MM (1) | 04799M | 36.000 |
56.000 |
$26.000 |
M | 0.0 |
| 1460 | 0179 | CONDUIT-100 MM (2) | 04799M | 193.100 |
213.100 |
$37.000 |
M | 0.0 |
| 1470 | 0180 | CONDUIT-100 MM (3) | 04799M | 3,356.700 |
3,368.700 |
$33.000 |
M | 0.6 |
| 1480 | 0181 | CONDUIT-100 MM (4) | 04799M | 297.700 |
327.700 |
$47.000 |
M | 0.1 |
| 1440 | 0182 | MANHOLE TYPE A | 01756 | 1.000 |
1.000 |
$2,100.000 |
EACH | 0.0 |
| 1490 | 0184 | ELECTRICAL CONDUIT | 08269 | 1.000 |
1.000 |
$6,700.000 |
LS | 0.0 |
| 1500 | 0269 | MANHOLE (TY J) | 09251M02 | 9.000 |
9.000 |
$2,700.000 |
EACH | 0.1 |
| 8051 | 8051 | CORE WALL Holes in wingwall for BellSouth Conduits on Bridge | 22100NN | 0.000 |
12.000 |
$250.000 |
EACH | 0.0 |
Category Total $165,943.70 |
| SM- Project | X056716304001 | CATEGORY NUMBER | 0010 | CATEGORY Description | MOB / DEMOB |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 2540 | 0315 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$2,560.000 |
LS | 0.0 |
| 2530 | 0316 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$5,000.000 |
LS | 0.0 |
Category Total $7,560.00 |
| SM- Project | X056716304001 | CATEGORY NUMBER | 0011 | CATEGORY Description | WATERLINE | CPES SUBSECTION K |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 2150 | 0195 | TIE-IN 8 INCH 200 MM (1) | 03468 | 1.000 |
1.000 |
$1,000.000 |
EACH | 0.0 |
| 2160 | 0196 | TIE-IN 8 INCH 200 MM (2) | 03468 | 1.000 |
2.000 |
$1,000.000 |
EACH | 0.0 |
| 2170 | 0197 | TIE-IN 8 INCH 200 MM (3) | 03468 | 3.000 |
5.000 |
$1,000.000 |
EACH | 0.0 |
| 2180 | 0198 | TIE-IN 12 INCH 300 MM (1) | 03472 | 8.000 |
12.000 |
$1,200.000 |
EACH | 0.1 |
| 2190 | 0199 | TIE-IN 12 INCH 300 MM (2) | 03472 | 6.000 |
6.000 |
$1,200.000 |
EACH | 0.0 |
| 2020 | 0200 | PLUG PIPE 200 MM | 01314 | 8.000 |
15.000 |
$185.000 |
EACH | 0.0 |
| 2030 | 0201 | PLUG PIPE 300 MM | 01314 | 16.000 |
17.000 |
$275.000 |
EACH | 0.0 |
| 2000 | 0206 | REMOVE PIPE 200MM | 01310M | 27.000 |
47.000 |
$45.000 |
M | 0.0 |
| 2010 | 0207 | REMOVE PIPE 300MM | 01310M | 111.000 |
116.000 |
$45.000 |
M | 0.0 |
| 2060 | 0208 | REMOVE AND RELOCATE METER 19MM | 03432 | 9.000 |
12.000 |
$850.000 |
EACH | 0.0 |
| 2080 | 0209 | REMOVE AND RELOCATE METER 25MM | 03432 | 8.000 |
8.000 |
$850.000 |
EACH | 0.0 |
| 2090 | 0210 | REMOVE AND RELOCATE METER 40MM | 03432 | 3.000 |
3.000 |
$850.000 |
EACH | 0.0 |
| 2100 | 0211 | REMOVE AND RELOCATE METER 50MM | 03432 | 1.000 |
1.000 |
$850.000 |
EACH | 0.0 |
| 2050 | 0212 | REMOVE AND RELOCATE METER 150MM | 03432 | 4.000 |
4.000 |
$1,200.000 |
EACH | 0.0 |
| 2070 | 0213 | REMOVE AND RELOCATE METER 200MM | 03432 | 3.000 |
4.000 |
$1,500.000 |
EACH | 0.0 |
| 2110 | 0214 | RECONNECT SERVICE 19MM | 03437 | 1.000 |
1.000 |
$850.000 |
EACH | 0.0 |
| 2130 | 0215 | RECONNECT SERVICE 25MM SHORT | 03437 | 1.000 |
3.000 |
$850.000 |
EACH | 0.0 |
| 2120 | 0216 | RECONNECT SERVICE 25MM LONG | 03437 | 1.000 |
2.000 |
$1,200.000 |
EACH | 0.0 |
| 2140 | 0217 | RECONNECT SERVICE 40MM | 03437 | 1.000 |
1.000 |
$850.000 |
EACH | 0.0 |
| 2040 | 0222 | FLOWABLE FILL | 02220M | 1,086.000 |
415.540 |
$110.000 |
CU M | 0.7 |
| 2230 | 0270 | INSTALL PIPE (DIP-200) | 09297M02 | 736.000 |
841.000 |
$55.000 |
M | 0.2 |
| 2240 | 0271 | INSTALL PIPE (DIP-300)1 | 09297M02 | 609.000 |
0.000 |
$67.000 |
M | 0.2 |
| 2250 | 0272 | INSTALL PIPE (DIP-300)2 | 09297M02 | 6,641.000 |
7,135.449 |
$78.000 |
M | 2.9 |
| 2200 | 0273 | INSTALL PIPE (COPPER-25) | 09297M02 | 88.000 |
198.000 |
$35.000 |
M | 0.0 |
| 2210 | 0274 | INSTALL PIPE (COPPER-40) | 09297M02 | 108.000 |
128.000 |
$35.000 |
M | 0.0 |
| 2220 | 0275 | INSTALL PIPE (COPPER-50) | 09297M02 | 138.000 |
138.000 |
$35.000 |
M | 0.0 |
| 2260 | 0276 | INSTALL PIPE (SEP-400)1 | 09297M02 | 46.000 |
0.000 |
$650.000 |
M | 0.2 |
| 2270 | 0277 | INSTALL PIPE (SEP-400)2 | 09297M02 | 189.000 |
224.000 |
$145.000 |
M | 0.2 |
| 2280 | 0278 | INSTALL PIPE (SEP-500)1 | 09297M02 | 78.000 |
0.000 |
$680.000 |
M | 0.3 |
| 2290 | 0279 | INSTALL PIPE (SEP-500)2 | 09297M02 | 481.000 |
531.000 |
$145.000 |
M | 0.4 |
| 2300 | 0280 | INSTALL VALVE (GATE VALVE-200) | 09298M02 | 15.000 |
15.000 |
$600.000 |
EACH | 0.1 |
| 2310 | 0281 | INSTALL VALVE (GATE VALVE-300) | 09298M02 | 73.000 |
73.000 |
$680.000 |
EACH | 0.3 |
| 2320 | 0282 | INSTALL LEAK DETECT ASSEMBLY | 09299M02 | 2.000 |
4.000 |
$2,200.000 |
EACH | 0.0 |
| 2330 | 0283 | INSTALL FIRE HYDRANT | 09300M02 | 31.000 |
33.000 |
$900.000 |
EACH | 0.2 |
| 2350 | 0284 | TRNASFER SERVICE (19MM) | 09301M02 | 2.000 |
2.000 |
$850.000 |
EACH | 0.0 |
| 2370 | 0285 | TRNASFER SERVICE (25MM) | 09301M02 | 2.000 |
2.000 |
$850.000 |
EACH | 0.0 |
| 2340 | 0286 | TRNASFER SERVICE (150MM) | 09301M02 | 2.000 |
2.000 |
$1,200.000 |
EACH | 0.0 |
| 2360 | 0287 | TRNASFER SERVICE (200MM) | 09301M02 | 1.000 |
1.000 |
$1,500.000 |
EACH | 0.0 |
| 2390 | 0288 | PAVEMENT RESTORATION (DRIVEWAY) | 09302M02 | 132.000 |
2.000 |
$75.000 |
SQ M | 0.1 |
| 2380 | 0289 | PAVEMENT RESTORATION (APPROACH) | 09302M02 | 221.000 |
1.000 |
$95.000 |
SQ M | 0.1 |
| 8014 | 8014 | TRANSFER SERVICE 50 MM | 09221M01 | 0.000 |
1.000 |
$950.000 |
EACH | 0.0 |
| 8016 | 8016 | EW~ Concrete Cap | 10093MX | 0.000 |
57.500 |
$180.000 |
M | 0.0 |
| 8029 | 8029 | REMOVE AND RELAY PIPE Reinstall with Flowable Fill | 01312M | 0.000 |
126.000 |
$58.390 |
M | 0.0 |
| 0276 | 8054 | STEEL ENCASEMENT PIPE-400 MM Open Cut | 01073M | 0.000 |
37.500 |
$565.000 |
M | 0.0 |
| 0278 | 8055 | STEEL ENCASEMENT PIPE-600 MM Open Cut | 01081M | 0.000 |
65.000 |
$575.000 |
M | 0.0 |
| 8057 | 8057 | VALUE ENGINEERING Change Casing Pipe Installation from Bore/Jack to Open Cut | 10121NX | 0.000 |
1.000 |
$12,251.250 |
DOLL | 0.0 |
Category Total $1,104,446.00 |
| SM- Project | X056716304001 | CATEGORY NUMBER | 0012 | CATEGORY Description | MOB / DEMOB |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 2540 | 0320 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$17,920.000 |
LS | 0.1 |
| 2530 | 0321 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$35,000.000 |
LS | 0.2 |
Category Total $52,920.00 |
| SM- Project | X056716304001 | CATEGORY NUMBER | 0001 | CATEGORY Description | ROADWAY | CPES SUBSECTION A |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0610 | 0001 | STRUCTURE GRANULAR BACKFILL | 02231M | 538.600 |
538.600 |
$45.000 |
CU M | 0.1 |
| 1140 | 0002 | STRUCTURE EXCAVATION-COMMON | 08001M | 3,335.900 |
3,335.900 |
$26.000 |
CU M | 0.5 |
| 1150 | 0003 | STRUCTURE EXCAV-SOLID ROCK | 08002M | 1,808.100 |
1,808.100 |
$40.000 |
CU M | 0.4 |
| 1210 | 0004 | CONCRETE-CLASS A | 08100M | 1,759.700 |
1,759.700 |
$300.000 |
CU M | 3.0 |
| 1230 | 0005 | STEEL REINFORCEMENT | 08150M | 196,125.000 |
196,125.000 |
$1.150 |
KG | 1.3 |
| 1250 | 0006 | SOUND BARRIER WALL | 09243M | 3,998.500 |
3,998.500 |
$160.000 |
SQ M | 3.6 |
| 1170 | 0007 | FOUNDATION PREPARATION (STA 13+640) | 08003 | 1.000 |
1.000 |
$10,000.000 |
LS | 0.1 |
| 1160 | 0008 | FOUNDATION PREPARATION ((STA 14+820) | 08003 | 1.000 |
1.000 |
$14,000.000 |
LS | 0.1 |
| 1180 | 0009 | FOUNDATION PREPARATION (STA 15+060) | 08003 | 1.000 |
1.000 |
$2,500.000 |
LS | 0.0 |
| 1190 | 0010 | FOUNDATION PREPARATION (STA 15+131) | 08003 | 1.000 |
1.000 |
$4,000.000 |
LS | 0.0 |
| < |