Item List 020099 |
Date:07/01/2008 |
KENTUCKY TRANSPORTATION CABINET
| Contract ID | 020099 | Primary Project Number | X059130304002 |
| Contract Description | TURKEY FOOT ROAD (KY1303) | ||
| Primary County | KENTON | Federal/State Number | STPM 8122 (19) |
| Vendor ID | 02520 | Vendor Name | ELMO GREER & SONS LLC |
| Bid Amount | $ 7,841,894.02 | ||
| SM- Project | X059130304002 |
| Fed/State Number | STPM 8122 (19) |
| Project Description | TURKEY FOOT ROAD (KY1303) |
| *********** |
| SM- Project | X059130304002 | CATEGORY NUMBER | 0001 | CATEGORY Description | ROADWAY | CPES SUBSECTION A |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0380 | 0001 | STRUCTURE GRANULAR BACKFILL | 02231M | 1,333.000 |
1,333.000 |
$25.000 |
CU M | 0.4 |
| 0790 | 0002 | STRUCTURE EXCAVATION-COMMON | 08001M | 6,297.000 |
3,597.560 |
$10.000 |
CU M | 0.8 |
| 0810 | 0003 | STRUCTURE EXCAV-SOLID ROCK | 08002M | 1,226.000 |
3,566.290 |
$40.000 |
CU M | 0.6 |
| 0620 | 0004 | MASONRY COATING | 02998M | 346.000 |
346.000 |
$9.000 |
SQ M | 0.0 |
| 0860 | 0005 | CONCRETE-CLASS A | 08100M | 4,757.700 |
3,123.900 |
$252.000 |
CU M | 15.3 |
| 0890 | 0006 | STEEL REINFORCEMENT | 08150M | 200,669.000 |
94,753.300 |
$1.080 |
KG | 2.8 |
| 0760 | 0007 | BOX CULVERT - 3 SIDED | 07300M02 | 46.800 |
46.800 |
$3,000.000 |
M | 1.8 |
| 0830 | 0008 | CONCRETE-CLASS A | 08100M | 352.100 |
352.100 |
$345.000 |
CU M | 1.5 |
| 0900 | 0009 | STEEL REINFORCEMENT | 08150M | 28,496.000 |
30,314.820 |
$1.080 |
KG | 0.4 |
| 0780 | 0010 | STRUCTURE EXCAVATION-COMMON | 08001M | 717.000 |
717.000 |
$10.000 |
CU M | 0.1 |
| 0820 | 0011 | STRUCTURE EXCAV-SOLID ROCK | 08002M | 141.000 |
192.850 |
$40.000 |
CU M | 0.1 |
| 0840 | 0012 | CONCRETE-CLASS A | 08100M | 94.400 |
94.400 |
$0.000 |
CU M | 0.0 |
| 0880 | 0013 | STEEL REINFORCEMENT | 08150M | 5,316.000 |
5,316.000 |
$0.000 |
KG | 0.0 |
| 0770 | 0014 | STRUCTURE EXCAVATION-COMMON | 08001M | 482.000 |
482.000 |
$0.000 |
CU M | 0.0 |
| 0800 | 0015 | STRUCTURE EXCAV-SOLID ROCK | 08002M | 143.000 |
143.000 |
$0.000 |
CU M | 0.0 |
| 0760 | 0016 | BOX CULVERT - 3 SIDED | 07300M02 | 67.700 |
67.700 |
$0.000 |
M | 0.0 |
| 0350 | 0017 | ROADWAY EXCAVATION | 02200M | 392,288.000 |
395,179.000 |
$2.750 |
CU M | 13.8 |
| 0360 | 0018 | SPECIAL EXCAVATION | 02204M | 1,276.000 |
1,556.000 |
$4.000 |
CU M | 0.1 |
| 0370 | 0019 | GRANULAR EMBANKMENT | 02223M | 191.000 |
191.000 |
$25.000 |
CU M | 0.1 |
| 0850 | 0020 | CONCRETE-CLASS A | 08100M | 19.220 |
23.480 |
$585.000 |
CU M | 0.1 |
| 0870 | 0021 | STEEL REINFORCEMENT | 08150M | 609.200 |
630.800 |
$1.650 |
KG | 0.0 |
| 0390 | 0022 | GUARDRAIL-STEEL W BEAM-S FACE | 02351M | 19.050 |
19.050 |
$42.000 |
M | 0.0 |
| 0400 | 0023 | GUARDRAIL TERMINAL SECTION NO 1 | 02360 | 4.000 |
4.000 |
$68.000 |
EACH | 0.0 |
| 0410 | 0024 | GUARDRAIL END TREATMENT TYPE 4A | 02391 | 13.000 |
13.000 |
$1,495.000 |
EACH | 0.2 |
| 0420 | 0025 | TEMPORARY GUARDRAIL | 02397M | 1,001.900 |
1,001.900 |
$31.250 |
M | 0.4 |
| 0680 | 0026 | PAVE STRIPING-TEMP REM TAPE-W | 06550M | 4,145.000 |
4,145.000 |
$3.220 |
M | 0.2 |
| 0690 | 0027 | PAVE STRIPING-TEMP REM TAPE-Y | 06551M | 5,934.000 |
5,934.000 |
$3.220 |
M | 0.2 |
| 0700 | 0028 | PAVE STRIPING-DUR TY 1-100MM W | 06554M | 4,126.000 |
0.000 |
$2.170 |
M | 0.1 |
| 0710 | 0029 | PAVE STRIPING-DUR TY 1-100MM Y | 06555M | 4,802.000 |
0.000 |
$2.170 |
M | 0.1 |
| 0720 | 0030 | PAVE STRIPING-DUR TY 1-150MM W | 06556M | 135.000 |
0.000 |
$2.850 |
M | 0.0 |
| 0730 | 0031 | PAVE STRIPING-DUR TY 1-300MM W | 06560M | 83.000 |
0.000 |
$5.080 |
M | 0.0 |
| 0740 | 0032 | PAVEMENT MARKER TYPE V-MW | 06589 | 109.000 |
109.000 |
$27.000 |
EACH | 0.0 |
| 0750 | 0033 | PAVEMENT MARKER TYPE V-BY | 06591 | 189.000 |
189.000 |
$27.000 |
EACH | 0.1 |
| 0610 | 0034 | FLASHING ARROW | 02775 | 2.000 |
2.000 |
$800.000 |
EACH | 0.0 |
| 0480 | 0035 | SIGNS | 02562M | 34.000 |
134.000 |
$85.000 |
SQ M | 0.0 |
| 0530 | 0036 | LANE CLOSURE | 02653 | 3.000 |
3.000 |
$1,400.000 |
EACH | 0.1 |
| 0300 | 0037 | BARRICADE-TYPE III | 02014 | 6.000 |
13.000 |
$100.000 |
EACH | 0.0 |
| 0320 | 0038 | REMOVE PAVEMENT | 02091M | 1,790.500 |
1,790.500 |
$1.950 |
SQ M | 0.0 |
| 0150 | 0039 | CULVERT PIPE-750 MM | 00466M | 149.500 |
149.500 |
$162.000 |
M | 0.3 |
| 0160 | 0040 | STORM SEWER PIPE-375 MM | 00521M | 343.500 |
363.500 |
$93.000 |
M | 0.4 |
| 0170 | 0041 | STORM SEWER PIPE-450 MM | 00522M | 786.850 |
865.510 |
$109.000 |
M | 1.1 |
| 0180 | 0042 | STORM SEWER PIPE-600 MM | 00524M | 485.900 |
485.900 |
$106.000 |
M | 0.7 |
| 0190 | 0043 | STORM SEWER PIPE-750 MM | 00526M | 318.800 |
318.800 |
$158.000 |
M | 0.6 |
| 0130 | 0044 | ENTRANCE PIPE-375 MM | 00440M | 70.900 |
70.900 |
$92.000 |
M | 0.1 |
| 0140 | 0045 | ENTRANCE PIPE-450 MM | 00441M | 72.800 |
95.900 |
$104.000 |
M | 0.1 |
| 0910 | 0046 | TEMPORARY PIPE (600MM) | 09030M02 | 43.700 |
43.700 |
$98.000 |
M | 0.1 |
| 0200 | 0047 | PERFORATED PIPE-100 MM | 01000M | 4,860.000 |
4,990.000 |
$15.750 |
M | 1.0 |
| 0210 | 0048 | NON-PERFORATED PIPE-100 MM | 01010M | 21.000 |
111.000 |
$52.500 |
M | 0.0 |
| 0920 | 0049 | TEMPORARY PIPE (750 MM) | 09030M02 | 47.000 |
47.000 |
$113.000 |
M | 0.1 |
| 0220 | 0050 | PERF PIPE HEADWALL TY 2-4 INCH | 01024 | 7.000 |
7.000 |
$220.000 |
EACH | 0.0 |
| 0930 | 0051 | OVERFLOW PIPE (300MM) | 09031M02 | 61.600 |
61.600 |
$66.000 |
M | 0.1 |
| 0940 | 0052 | RISER PIPE (300MM) | 09032M02 | 14.000 |
14.000 |
$119.000 |
M | 0.0 |
| 0230 | 0053 | CURB BOX INLET TYPE A | 01456 | 62.000 |
64.000 |
$2,400.000 |
EACH | 1.9 |
| 0240 | 0054 | DROP BOX INLET TYPE 3 | 01496 | 2.000 |
2.000 |
$2,500.000 |
EACH | 0.1 |
| 0250 | 0055 | DROP BOX INLET TYPE 11 | 01544 | 8.000 |
9.000 |
$2,500.000 |
EACH | 0.3 |
| 0340 | 0056 | PAVED DITCH TYPE 1 | 02157M | 188.000 |
188.000 |
$50.000 |
SQ M | 0.1 |
| 0260 | 0057 | MANHOLE TYPE C | 01767 | 1.000 |
1.000 |
$3,000.000 |
EACH | 0.0 |
| 0270 | 0058 | FILL AND CAP MANHOLE | 01786 | 1.000 |
1.000 |
$2,000.000 |
EACH | 0.0 |
| 0650 | 0059 | SEEDING AND PROTECTION | 05985M | 82,431.000 |
102,141.000 |
$0.380 |
SQ M | 0.4 |
| 0630 | 0060 | TEMP SEEDING AND PROTECTION | 05953M | 8,243.000 |
108,243.000 |
$0.320 |
SQ M | 0.0 |
| 0660 | 0061 | SPECIAL SEEDING CROWN VETCH | 05989M | 52,000.000 |
83,100.000 |
$0.250 |
SQ M | 0.2 |
| 0670 | 0062 | SODDING | 05990M | 2,961.100 |
7,311.100 |
$3.650 |
SQ M | 0.1 |
| 0640 | 0063 | TOPDRESSING FERTILIZER | 05966M | 5.000 |
5.000 |
$530.000 |
MTON | 0.0 |
| 0560 | 0064 | SILT CHECK | 02705 | 42.000 |
212.000 |
$65.000 |
EACH | 0.0 |
| 0570 | 0065 | CLEAN SILT CHECK | 02708 | 126.000 |
126.000 |
$25.000 |
EACH | 0.0 |
| 0540 | 0066 | TEMPORARY SILT FENCE | 02701M | 440.000 |
2,240.000 |
$5.350 |
M | 0.0 |
| 0580 | 0067 | CLEAN TEMPORARY SILT FENCE | 02709M | 880.000 |
980.000 |
$1.500 |
M | 0.0 |
| 0950 | 0068 | TEMP SILT BASIN | 09033N02 | 18.000 |
18.000 |
$300.000 |
EACH | 0.1 |
| 0960 | 0069 | CLEAN TEMP SILT BASIN | 09034N02 | 36.000 |
36.000 |
$100.000 |
EACH | 0.0 |
| 0450 | 0070 | CHANNEL LINING CLASS II | 02483M | 1,190.400 |
1,395.400 |
$17.000 |
MTON | 0.3 |
| 0460 | 0071 | CHANNEL LINING CLASS III | 02484M | 790.600 |
1,290.600 |
$19.000 |
MTON | 0.2 |
| 0500 | 0072 | FABRIC-GEOTEXTILE TYPE III | 02598M | 428.000 |
428.000 |
$2.000 |
SQ M | 0.0 |
| 0510 | 0073 | FABRIC-GEOTEXTILE TYPE IV | 02599M | 8,040.000 |
8,420.000 |
$2.000 |
SQ M | 0.2 |
| 0430 | 0074 | R/W MARKER RURAL TYPE 1 | 02434 | 69.000 |
69.000 |
$75.000 |
EACH | 0.1 |
| 0440 | 0075 | R/W MARKER MUNICIPAL TYPE 1 | 02437 | 14.000 |
14.000 |
$70.000 |
EACH | 0.0 |
| 0280 | 0076 | STANDARD CURB AND GUTTER | 01810M | 4,372.500 |
4,492.500 |
$36.500 |
M | 2.0 |
| 0290 | 0077 | LIP CURB AND GUTTER | 01820M | 68.300 |
68.300 |
$50.000 |
M | 0.0 |
| 0590 | 0078 | SIDEWALK-100 MM CONCRETE | 02720M | 5,300.600 |
5,300.600 |
$25.500 |
SQ M | 1.7 |
| 0330 | 0079 | CEM CONC ENT PAVEMENT-150 MM | 02099M | 393.400 |
1,123.400 |
$45.000 |
SQ M | 0.2 |
| 0310 | 0080 | JPC PAVEMENT-150 MM | 02075M | 70.600 |
146.260 |
$45.000 |
SQ M | 0.0 |
| 0060 | 0081 | CRUSHED AGGREGATE SIZE NO 2 | 00078M | 15.000 |
15.000 |
$84.000 |
MTON | 0.0 |
| 0010 | 0082 | D G A BASE | 00001M | 12,059.000 |
15,264.930 |
$11.600 |
MTON | 1.8 |
| 0120 | 0083 | ASPHALT CURING SEAL | 00358M | 93.300 |
93.540 |
$200.000 |
MTON | 0.2 |
| 0050 | 0084 | DRAINAGE BLANKET-EMBANKMENT | 00021M | 1,334.000 |
1,614.000 |
$23.500 |
CU M | 0.4 |
| 0970 | 0085 | TEMPORARY PAVEMENT | 09035M02 | 1,005.000 |
4,026.000 |
$20.920 |
SQ M | 0.3 |
| 0040 | 0086 | DRAINAGE BLANKET-TYPE II-ASPH | 00018M | 10,086.500 |
10,136.500 |
$26.350 |
MTON | 3.4 |
| 0020 | 0087 | LIME STABILIZED ROADBED | 00013M | 47,281.000 |
47,204.000 |
$1.950 |
SQ M | 1.2 |
| 0030 | 0088 | LIME | 00014M | 1,002.800 |
1,001.300 |
$90.000 |
MTON | 1.2 |
| 0550 | 0089 | SAND FOR BLOTTER | 02702M | 127.500 |
128.100 |
$35.000 |
MTON | 0.1 |
| 0080 | 0090 | CL3 ASPH BASE 19.0D PG64-22 | 00223M | 19,827.000 |
19,918.000 |
$26.500 |
MTON | 6.7 |
| 0090 | 0091 | CL3 ASPH BASE 19.0D PG76-22 | 00225M | 7,051.500 |
7,085.500 |
$32.000 |
MTON | 2.9 |
| 0070 | 0092 | CL1 ASPH BASE 19.0D PG64-22 | 00220M | 223.700 |
420.970 |
$36.000 |
MTON | 0.1 |
| 0100 | 0093 | CL1 ASPH SURF 9.50D PG64-22 | 00300M | 149.700 |
205.670 |
$37.250 |
MTON | 0.1 |
| 0110 | 0094 | CL3 ASPH SURF 12.5A PG76-22 | 00332M | 3,759.700 |
3,929.700 |
$37.450 |
MTON | 1.8 |
| 0470 | 0095 | CLEARING AND GRUBBING | 02545 | 1.000 |
1.000 |
$88,000.000 |
LS | 1.1 |
| 0600 | 0096 | STAKING | 02726 | 1.000 |
1.000 |
$75,000.000 |
LS | 1.0 |
| 0520 | 0097 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$27,500.000 |
LS | 0.4 |
| 0980 | 0098 | GAS UTILITY CONSTRUCTION | 09036N02 | 1.000 |
1.000 |
$7,000.000 |
LS | 0.1 |
| 0490 | 0099 | QUALITY CONTROL | 02572 | 1.000 |
0.000 |
$55,000.000 |
LS | 0.7 |
| 8000 | 8000 | PAVE STRIPING-THERMO-100 MM W | 06540M | 0.000 |
0.000 |
$1.910 |
M | 0.0 |
| 8001 | 8001 | PAVE STRIPING-THERMO-100 MM Y | 06541M | 0.000 |
0.000 |
$1.910 |
M | 0.0 |
| 8002 | 8002 | PAVE STRIPING-THERMO-150 MM W | 06542M | 0.000 |
135.000 |
$2.470 |
M | 0.0 |
| 8003 | 8003 | PAVE STRIPING-THERMO-300 MM W | 06546M | 0.000 |
83.000 |
$8.940 |
M | 0.0 |
| 8004 | 8004 | PAVE STRIPING-TEMP PAINT-100MM | 06510M | 0.000 |
25,079.000 |
$0.680 |
M | 0.0 |
| 8005 | 8005 | INSPECT & CERTIFY EDGE DRAIN SYSTEM | 01015 | 0.000 |
1.000 |
$7,500.000 |
LS | 0.0 |
| 8006 | 8006 | SILT TRAP TYPE B | 02704 | 0.000 |
15.000 |
$350.000 |
EACH | 0.0 |
| 8007 | 8007 | CLEAN SILT TRAP TYPE B | 02707 | 0.000 |
30.000 |
$150.000 |
EACH | 0.0 |
| 8008 | 8008 | RETAINING WALL-GABION | 02610M | 0.000 |
86.000 |
$240.800 |
CU M | 0.0 |
| 8016 | 8016 | EW~ PRECAST ARCH CULVERT | 10093MX | 0.000 |
173.700 |
$3,028.820 |
M | 0.0 |
| 8017 | 8017 | QUALITY CONTROL (MODIFIED) | 02572 | 0.000 |
1.000 |
$41,264.470 |
LS | 0.0 |
| 8018 | 8018 | SAFELOADING | 02690M | 0.000 |
30.000 |
$174.640 |
CU M | 0.0 |
| 8019 | 8019 | EROSION CONTROL BLANKET | 05950M | 0.000 |
2,896.000 |
$2.200 |
SQ M | 0.0 |
| 8020 | 8020 | TRAFFIC BOUND BASE | 00020M | 0.000 |
4,500.000 |
$16.900 |
MTON | 0.0 |
| 8021 | 8021 | PAVE STRIPING-PERM PAINT-100MM | 06514M | 0.000 |
8,988.000 |
$0.650 |
M | 0.0 |
| 8022 | 8022 | PAVE MARKING-PRE THERM CURV ARROW | 06574 | 0.000 |
18.000 |
$104.650 |
EACH | 0.0 |
| 8023 | 8023 | PAVE MARKING-BICYCLE SYMBOL | 09400 | 0.000 |
14.000 |
$123.170 |
EACH | 0.0 |
| 8024 | 8024 | ROADWAY EXCAVATION P#221 | 02200M | 0.000 |
342.500 |
$10.460 |
CU M | 0.0 |
| 8026 | 8026 | EW~ REPAIR GAS SERVICE | 10090NX | 0.000 |
1.000 |
$360.000 |
LS | 0.0 |
| 8027 | 8027 | EMBANKMENT IN PLACE | 02230M | 0.000 |
120.000 |
$19.620 |
CU M | 0.0 |
| 0980 | 8028 | GAS UTILITY CONSTRUCTION RELOCATE GAS LINE | 09036N02 | 0.000 |
1.000 |
$5,725.080 |
LS | 0.0 |
| 8029 | 8029 | EW~ Sand Barrels | 10090NX | 0.000 |
1.000 |
$3,947.320 |
LS | 0.0 |
| 8030 | 8030 | EW~ Slide Repair | 10090NX | 0.000 |
1.000 |
$22,361.330 |
LS | 0.0 |
| 9031 | 8031 | REMOVE DRIVEWAY | 74072N | 0.000 |
1.000 |
$2,932.380 |
LS | 0.0 |
| 8032 | 8032 | REMOVE HEADWALL | 02625 | 0.000 |
4.000 |
$450.000 |
EACH | 0.0 |
| 8033 | 8033 | FUEL ADJUSTMENT | 10020NS | 0.000 |
63,526.800 |
$1.000 |
DOLL | 0.0 |
| 8034 | 8034 | ASPHALT ADJUSTMENT | 10030NS | 0.000 |
28,233.900 |
$1.000 |
DOLL | 0.0 |
| 8035 | 8035 | EW~ CONCRETE ADJUSTMENT | 10098NX | 0.000 |
25,658.100 |
$1.000 |
DOLL | 0.0 |
Category Total $5,915,626.93 |
| SM- Project | X059130304002 | CATEGORY NUMBER | 0003 | CATEGORY Description | WATERLINE | CPES SUBSECTION C |
| Prop Bid LN | PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 1390 | 0100 | DUCTILE IRON PIPE-150 MM | 01093M | 6.000 |
6.000 |
$94.500 |
M | 0.0 |
| 1400 | 0101 | DUCTILE IRON PIPE-200 MM | 01095M | 138.000 |
138.000 |
$102.900 |
M | 0.2 |
| 1410 | 0102 | DUCTILE IRON PIPE-300 MM | 01099M | 1,164.000 |
1,164.000 |
$107.100 |
M | 1.6 |
| 1580 | 0103 | ANCHOR TEE & BLOCK (300 MM X 300 MM X 150 MM) | 09037 | 7.000 |
7.000 |
$288.750 |
EACH | 0.0 |
| 1590 | 0104 | ANCHOR TEE & BLOCK (300 MM X 300 MM X 200 MM) | 09037 | 1.000 |
1.000 |
$315.000 |
EACH | 0.0 |
| 1600 | 0105 | TEE & BLOCK | 09038 | 4.000 |
4.000 |
$472.500 |
EACH | 0.0 |
| 1540 | 0106 | GATE VALVE-6 INCH | 03526 | 7.000 |
7.000 |
$488.250 |
EACH | 0.0 |
| 1550 | 0107 | GATE VALVE-8 INCH | 03528 | 2.000 |
2.000 |
$703.500 |
EACH | 0.0 |
| 1560 | 0108 | GATE VALVE-12 INCH | 03532 | 13.000 |
13.000 |
$1,338.750 |
EACH | 0.2 |
| 1610 | 0109 | BEND & BLOCK 150 MM | 09040 | 2.000 |
2.000 |
$189.000 |
EACH | 0.0 |
| 1620 | 0110 | BEND & BLOCK 200 mm | 09040 | 2.000 |
2.000 |
$210.000 |
EACH | 0.0 |
| 1630 | 0111 | BEND & BLOCK 300 MM | 09040 | 20.000 |
20.000 |
$283.500 |
EACH | 0.1 |
| 1640 | 0112 | REDUCER 200MM X 150 MM | 09041 | 2.000 |
2.000 |
$136.500 |
EACH | 0.0 |
| 1650 | 0113 | REDUCER 300 MM X 150 MM | 09041 | 1.000 |
1.000 |
$168.000 |
EACH | 0.0 |
| 1510 | 0114 | TIE-IN TO EXISTING WATER LINE 150 MM | 03460 | 1.000 |
1.000 |
$525.000 |
EACH | 0.0 |