Accelerated Bridge Construction (ABC)
  
  
  
ABC Decision Making Aid Spreadsheet.xlsxABC Decision Making Aid Spreadsheet11/14/2013
ABCGuidelines.docxABCGuidelines11/14/2013
Precast End Bent Example.pdfPrecast End Bent Example11/14/2013
Precast Slab Bridge Example.pdfPrecast Slab Bridge Example11/14/2013
Sample A + B Bidding Note.docxSample A + B Bidding Note11/14/2013
Slab Precast with Rolled Steel Girders.pdfSlab Precast with Rolled Steel Girders11/14/2013

  

Harlan County - KY 219

Harlan County – KY 219, Wallins Creek Road 

 
Workers installing one of the precast deck slabs.  The existing beams were removed and the new superstructure was installed within an 8 hour closure period.

 

 

Formwork for one of the precast pile end bents.  Self consolidating concrete was used in both the pile end bents and box girders

 

Franklin County – KY 2919, Indian Gap Road 

 
Formwork for one of the precast pile end bents.  Self consolidating concrete was used in both the pile end bents and box girders for this project.  The entire bridge was replaced within 19 days using ABC methods.