Professional Services
This page contains vital information relating to the procurement of professional engineering and engineering-related services. Revisions are made frequently.
 
Please check back periodically for updates.
Body
7/8/2014 4:31 PM

NOTICE: Implementation of MAP-21 Uniform Act Benefit and Eligibility Changes (Mandatory Training)

KYTC will implement changes to the Uniform Act per MAP-21(Moving Ahead for Progress in the 21st Century Act).  The MAP-21 amended the maximum statutory benefit for replacement housing payments for displaced homeowners to $31,000 and replacement housing payments for displaced tenants to $7,200. The length of occupancy requirement for homeowners was reduced from 180 days to 90 days in occupancy before the initiation of negotiations. The MAP-21 also amended the maximum statutory benefit for business reestablishment benefits to $25,000, and the fixed payment for nonresidential moves to $40,000. By law, these changes become effective on October 1, 2014 at the Federal level.  In hopes of moving forward KYTC will implement this process at the State level effective July 1, 2014.

6/30/2014 2:10 PM

NOTICE: The instructions for invoicing Engineering and Engineering-Related Services have be updated.  Please note the following changes.

Traffic Engineering Prequal for Highway Design 2013-05.pdfTC 40-408 Pay Estimate Instructions 6-24-14

1)      Contract remaining encumbered balances of less than $5,000 will liquidate on July 1st of each year and close the contract.  The threshold previously was $1,000, but was raised to $5,000 this year.
2)      Consultant vendors must list any DBE participation for this billing period in the designated box in the lower left side of the form.  This should include DBE firm name and amount.

6/26/2014 8:42 AM

NOTICE: Memo from Division of Right of Way and Utilities

Consultant Prequalification Criteria for Right of Way Acquisition and Relocation Services

Traffic Engineering Prequal for Highway Design 2013-05.pdfMemorandum Right of Way 6-20-14.pdf
The TC 40-1 Prequalification Application and the Prequalification Criteria and Instructions have been updated to reflect these changes.​

6/25/2014 9:17 AM

​NOTICE: Pay Estimate Form Update

An updated "TC 40-408 Engineering and Engineering-Related Services Pay Estimate" form has been created and added to the Professional Services Forms website. This form will replace the old Highway Design TC 61-408 form.
A completed Example TC 40-408 is also available.
The Instructions Document remains unchanged and is also available on the Professional Services Forms site.  The Instructions Document contains detailed step by step directions for submitting and approving a pay estimate.

6/20/2014 12:41 PM
6/13/2014 8:12 AM

NOTICE: Memo from Division of Construction- Revised Consultant Prequalification Criteria for Bridge Painting Project Inspection and Bridge Painting Project Maintenance - 3-11-14

Memorandum Construction 3-11-14.pdfMemorandum Construction 3-11-14.pdf
The Prequalification Criteria and Instructions have been updated to reflect these changes.​

3/13/2014 11:35 AM

NOTICE: Firms Seclected for an Overhead Audit in 2014.

Firms Selected for an Overhead Audit in 2014.pdf
Please see External Audit webpage for additional information.
http://transportation.ky.gov/Audits/Pages/External-Audit.aspx

2/20/2014 8:57 AM

​NOTICE: Structural Design Production-Hour Worksheet​

T​he Division of Professional Services has worked with the Division of Structural Design to create a standard production-hour worksheet. For any projects that include structure design services, please provide the Division of Structure Design with a project scope and agree to units before submitting an estimate to Professional Services.

Structural Design Production-Hour Worksheet.xlsxStructural Design Production-Hour Worksheet.xlsx

1/24/2014 11:32 AM

NOTICE: Memo from Division of Traffic Operations - Revised Consultant Prequalification criteria for Electrical Engineering Services.

Memorandum Traffic 11-1-12
The Prequalification Criteria and Instructions have been updated to reflect these changes.​

2/20/2014 9:01 AM

NOTICE: Statewide Services Anticipated Advertisement Schedule for 2014

T​he Division of Professional Services has been coordinating with various Divisions of the Kentucky Transportation Cabinet on expiring statewide consultant services. We currently anticipate posting advertisements for various services in the month shown in this link but all dates are subject to change. Please feel free to review the current RFP or contact the Project Manager listed for more information prior to advertisement of the next round of services.

Statewide services advertising schedule.pdfStatewide services advertising schedule.pdf

10/28/2013 3:50 PM

NOTICE: Memo from Division of Highway Design- removal of Basic Traffic Engineering Design prequalification category and revisions to Advanced Traffic Engineering Design and Modeling category - 5-10-13

Traffic Engineering Prequal for Highway Design 2013-05.pdfTraffic Engineering Prequal for Highway Design 2013-05.pdf
The TC 40-1 Prequalification Application
and the Prequalification Criteria and Instructions have been updated to reflect these changes.​

2/20/2014 9:02 AM
9/24/2013 4:05 PM

NOTICE: Scope Verification Meetings

In accordance with the FHWA and KYTC Stewardship Plan, dated December 2012, a Scope Verification Meeting (SVM) will be conducted for all federal-aid projects requiring a Categorical Exclusion Level 3 (CE3), EA/FONSI or EIS to document appropriate consideration of environmental impacts. The purpose of the SVM is to gather key members of the Project Team, including FHWA, to assure that all members are in agreement with the work to be undertaken. Normally, the SVM will be conducted during the time between the advertisement for Professional Services and the Pre-Design Meeting. Timing of the meeting is important, to assure that all parties are in agreement with the scope of the work to be tasked to the consultant prior to the Pre-Design Meeting. This project requirement is effective immediately.

Scope Verification Meeting.pdf

4/1/2013 8:50 AM

​​UPDATED - General Provisions - These general provisions have been updated to include Finance and Administration Cabinet requirements for access to records clause and will apply to all new professional service contacts fully executed on or after 9-15-11.

Access to Records Clause 092011.pdfAccess to Records Clause 092011.pdf

SO 11-004 Vendor Document Disclosure.pdfSO 11-004 Vendor Document Disclosure.pdf

11/7/2011 10:18 AM
Contact Information Contact Info
Kentucky Transportation Cabinet
Division of Professional Services
200 Mero Street, 3rd Floor
Frankfort, KY 40622
Phone: (502) 564-4555
Fax: (502) 564-4422
Map it

Director, Michael Hill, PE
Current Events
Aug
6
July Procurement Bulletin 2015-01 is due
8:00 am to 4:30 pm
Aug
12
Jackson-Owsley KY 30 10-279.60 1st Consultant Selection
2:00 pm to 2:30 pm
Aug
27
Jackson-Owsley KY 30 10-279.60 2nd Consultant Selection
10:00 am to 11:00 am