Kennedy Bridge Replacement (7-1116.00)
3D Rendering of Proposed Kennedy Mill Bridge
07-1117.00_3D Rendering_Haunched Steel Plate Girder.jpg
Click on image above to enlarge.


Aerial of Existing Kennedy Mill Bridge​
Photo.jpg 
 

 Public Meeting #2

 

​Held

December 13, 2012 at the
Burgin Elementary School Cafeteria from
5:00 pm to 7:00 pm

"Stop By Anytime"

*Click here for more information.

 

 Public Meeting #1

 

Below is information from the public meeting on Tuesday, April 3, 2012.

Exhibit-Alternates.jpg 

* Aerial Photo with Alternatives (19.5 MB)

* Handout Information (0.5 MB)

* Existing Bridge Exhibit (0.6 MB)

* Questionnaire (0.3 MB)
       

 

 
UPDATE:  Contrary to the announcement at the public meeting of the closing of the bridge on April 16, 2012, the Cabinet has decided NOT to close the bridge to perform the geotechnical work at this time.

 

 

​​
 
 
KYTC - Project Manager
KYTC Logo.jpg

Ananias Calvin III, P.E.
763 West New Circle Road Lexington, KY 40512
(859) 246-2355
Ananias.Calvin@ky.gov
 
​​
 
Design Consultant
 
wmb.jpg 
WMB Inc.
Charles Raymer, P.E.
1950 Haggard Court
Lexington, KY  40505
(859) 299-5226