2008-07 Jefferson 5-8203.00 Billtown Road QUESTION: In the traffic study referenced in
the RFP, traffic signals are recommended for a couple of the intersections
listed in the RFP. Will prequalification in TRAFFIC ENGINEERING and
ELECTRICAL ENGINEERING services be apart of the project requirements? ANSWER: Any necessary Traffic Signal design will be by the Department. Prequalification in Traffic Engineering or Electrical Engineering will not be required. 2008-07 Jefferson 5-8203.00 Billtown Road QUESTION: The current ad for ANSWER: The Construction Estimates in the Study are as follows: Billtown at Michael Edward and Fairground $660,000 Billtown at Mary Dell $ 75,000 Billtown between Vintage Creek and Colonnades $180,000 Billtown at Lover's Lane $330,000 Billiton at Easum $200,000 TOTAL $1,445,000 The estimate Phase I and Phase II design costs for these spot improvements range from $150,000 to $250,000 per location with the exception of Billtown at Mary Dell which is estimated at $15,000. Phase II design is to be negotiated at the end of Phase I and added by contract modification. |
|
The above Q & A
section is dealing with the 2008-07 Project Listing |